What Is Included in a Bathroom Renovation? (Houston Guide)

Bathroom Remodeling Houston TX
Bathroom RemodelingMAV Design & Build — Houston TX✅ Veteran-Owned  ✅ Licensed & Insured  ✅ Free EstimatesGet a Free Quote →
Bathroom Remodeling · Houston, TX
What a Bathroom Remodel Actually Includes

A full-scope Houston bathroom renovation covers design, demolition, waterproofing, tile, the shower or tub, vanity, plumbing, electrical, ventilation, flooring and permits — all under one design-build contract. Ventilation has its own Houston code minimum, separate from the rest of the scope — see MAV’s guide to bathroom exhaust fan CFM and venting code rules for the exact CFM numbers and the attic-venting mistake to avoid.

Book a Bathroom ConsultationCall (832) 532-6829
A remodeled Houston bathroom with a glass-enclosed shower, floating double vanity and freestanding tub, finished in a modern gray palette.
1–15
Business days Houston Permitting Center posts to review a Residential Remodel Permit
6
Completed Houston bathroom remodels shown in MAV’s own project gallery
5.0
MAV’s rating on Google (verified Business Profile)

Sources: Houston Permitting Center, Residential Remodel Permit, MAV’s own project gallery, Google Business Profile. Checked Sept 25, 2026.

Everything a bathroom renovation covers

A full bathroom renovation rebuilds a wet, high-use room from the studs out — not just new fixtures. Design & planning covers an in-home consultation, measurements, 3D rendering, fixture and tile selection, and an agreed scope before demolition starts. Demolition removes the old tile, tub/shower, vanity and flooring, with haul-away included. Waterproofing adds cement backer board and a waterproofing membrane behind the tile in every wet area. Tile work covers the floor, shower walls and any accent tile, with proper slope to the drain. The vanity and countertop come in stock, semi-custom or custom options. Plumbing covers fixtures, valves and supply/drain lines at their existing locations, by a licensed plumber. Electrical & ventilation covers GFCI outlets, lighting and a correctly sized exhaust fan, by a licensed electrician. Flooring, paint and trim finish the room, and permits & inspections cover the City of Houston approvals the scope requires.

Interactive check
Which Houston permit applies to my bathroom project?

Pick the option that best describes your project:

This falls under the City’s Residential Remodel Permit, which the Houston Permitting Center describes as covering “remodel or conversion of existing buildings” — posted processing time is 1–15 business days.
This falls under the City’s Residential Addition Permit, described as covering additions to existing buildings — posted processing time is 10 business days.
Scope like this may fall outside these two permit types. The Houston Permitting Center is the authoritative source — confirm your specific project with them before work starts.

This helper summarizes Houston Permitting Center descriptions and is not a permitting determination. Confirm your project with the City before work starts.

Why waterproofing is the step that matters most

Houston sits in one of the most humid, highest-rainfall climate zones in the continental U.S. A bathroom is already the wettest room in the house; in a climate like this, tile alone is not a waterproofing system — grout and caulk are maintenance items, not a barrier. That is why MAV treats cement backer board plus a full waterproofing membrane behind the tile, in every wet area, as standard scope on every bathroom renovation, not an upgrade.

A frameless glass corner shower with marble-look porcelain tile, a herringbone mosaic accent niche and matching shower floor, and pull-style grab bars, from a MAV Houston bathroom remodel.
A frameless glass shower with marble-look tile and a herringbone mosaic niche and floor — the tile sits over a full waterproofing membrane, not just caulk.

City of Houston permit review time

Posted permit review time by type
Residential Remodel Permit — fastest posted: 1 business daysResidential Remodel Permit — fastest posted1 business daysResidential Remodel Permit — slowest posted: 15 business daysResidential Remodel Permit — slowest posted15 business daysResidential Addition Permit: 10 business daysResidential Addition Permit10 business days
+View as table
ItemValue (business days)
Residential Remodel Permit — fastest posted1
Residential Remodel Permit — slowest posted15
Residential Addition Permit10

Source: Houston Permitting Center, Residential Remodel Permit and Residential Addition Permit (both pages block automated fetches; quotes verified via archived capture and corroborated via search Sept 25, 2026). This is the posted plan-review window, not the full project timeline.

Renovation process: before, during, after

  1. 1
    Before
    Design & scope agreement
    In-home consultation, measurements, 3D rendering, and fixture/tile selection, with the scope agreed before demolition starts.
  2. 2
    Before
    Confirm the permit path
    Remodeling within the existing footprint vs. adding square footage determines whether the Residential Remodel Permit or Residential Addition Permit applies.
  1. 1
    During
    Demolition & waterproofing
    Old tile, tub/shower, vanity and flooring come out; cement backer board and a waterproofing membrane go in behind every wet-area tile surface.
  2. 2
    During
    Trades: plumbing, electrical, tile
    Licensed plumbing and electrical work (fixtures, GFCI outlets, exhaust fan), then tile, vanity and countertop installation.
  1. 1
    After
    Flooring, paint, trim, inspection
    Final flooring, paint and trim, followed by the City inspections tied to your permit.
  2. 2
    After
    Walkthrough
    A final walkthrough against the scope agreed at the start.

Standard scope vs. common add-ons

Standard scope
Walk-in showers, tub-to-shower conversions, spa bathrooms and master bathroom build-outs at existing fixture locations — all within MAV’s standard renovation scope.
Common add-ons
Relocating drains or supply lines to a new layout, structural wall changes, electrical panel upgrades, and converting a tub space into a curbless shower. See MAV’s curbless, zero-threshold walk-in shower guide for the clearances and construction method behind that conversion.
A freestanding matte-black soaking tub with a floor-mount filler, set against painted wainscoting, from a MAV bathroom remodel.
A freestanding soaking tub with a floor-mount filler, against painted wainscoting.
A glass-enclosed shower finished in forest-green vertical tile with a built-in hex-tile bench, from a MAV bathroom remodel.
A glass-enclosed shower finished in forest-green vertical tile, with a built-in bench.
A sliding barn door added at a bathroom entry, with a double vanity visible beyond, from a MAV bathroom remodel.
A sliding barn door added at a bathroom entry, with the double vanity visible beyond.
What MAV bathroom clients say on Google5.0on Google

Verified Google reviews from MAV Design & Build bathroom remodel clients.

“I had an excellent experience with this team during my bathroom renovation. From the first meeting to the final result, everything was handled smoothly and professionally.”

Ashenafi Abrham · Google review

“Amazing bathroom remodel from start to finish. The team was professional, detail oriented, and delivered exactly what I wanted.”

Amir Senemar · Google review

“I recently had my bathroom remodeled by this company, and I couldn’t be happier with the results!”

Octavio Robles · Google review

“great company very professional team did my bathroom remodeling”

Samuel Bekele · Google review
Read all reviews on Google →

About MAV Design & Build

Veteran-owned
Licensed and insured Texas general contractor.
Design-build, one contract
Design, permitting coordination and every trade under one contract.

Frequently asked questions

Is waterproofing included in a bathroom remodel?+
With MAV Design & Build, yes — cement backer board and a waterproofing membrane in every wet area (behind tile, not just visible caulk) is standard scope, not an upcharge.
Does a bathroom renovation include moving the plumbing?+
Basic fixture swaps (same locations) are included. Relocating drains or supply lines to a new layout is treated as an add-on, because it involves opening the floor or walls beyond standard demolition.
Do you replace the exhaust fan?+
Yes. A correctly sized, properly vented exhaust fan is part of a standard bathroom renovation — not an optional extra.
How long does a bathroom renovation take?+
Per MAV’s own published project guidance: a guest or hall bath typically runs 2–4 weeks; a full master bathroom runs 4–8 weeks. Actual duration depends on scope, material lead times and whether layout changes are involved.
Do I need a City of Houston permit for a bathroom remodel?+
It depends on scope. The Houston Permitting Center lists a Residential Remodel Permit (covers “remodel or conversion of existing buildings,” posted processing time 1–15 business days) and a Residential Addition Permit (covers additions, 10 business days) for work like plumbing, electrical and structural changes. Confirm your specific scope directly with the Houston Permitting Center.
What is usually NOT included, and priced as an add-on?+
Relocating plumbing to a new layout, structural wall changes, upgrading a home’s electrical panel to support new circuits, and major layout changes (e.g. converting a tub space into a curbless shower) are the most common add-ons beyond a standard-scope renovation.

Planning a bathroom remodel?

Talk through scope, waterproofing and the permit path before you sign a contract. If the scope includes moving fixtures or adding outlets, see our guide to bathroom electrical code (GFCI, the 20-amp circuit & AFCI) in Houston.

Book a Bathroom ConsultationCall (832) 532-6829

For pricing, see MAV’s bathroom remodeling overview and walk-in shower cost guide. For general City of Houston permitting, see what permits are required for remodeling in Houston. Planning a kitchen instead? See what’s included in a kitchen remodel.

Sources
  1. Houston Permitting Center: Residential Remodel Permit
  2. Houston Permitting Center: Residential Addition Permit
  3. MAV Design & Build: Bathroom Remodeling Project Gallery
  4. MAV Design & Build: Google Business Profile

All facts above were checked against these sources on September 25, 2026. The two Houston Permitting Center pages return HTTP 403 to automated fetches; their quoted processing times were verified against an archived capture and independently corroborated via search results pulled directly from houstonpermittingcenter.org on the same date. Where a fact from the previous version of this page (e.g. a specific Houston humidity percentage) could not be independently verified against a primary source, it was removed rather than restated.

What Houston Homeowners Say⭐ 5.0  •  Google Reviews
Waseem NaqviApril 2026
★★★★★

I'm extremely satisfied with my kitchen renovation. The entire process was handled with professionalism and precision. The crew was respectful, efficient, and always made sure I was informed every step of the way. The final result — a beautiful, well-designed kitchen with top-quality finishes and excellent craftsmanship.

AviadApril 2026
★★★★★

Love their work, the kitchen turned out amazing and exceeded our expectations. Completed in much shorter time than I thought it would. Can't recommend them enough!!

Dwight HoldenMarch 2026
★★★★★

Great experience working with this company! They remodeled my kitchen and did an amazing job. The team was professional, easy to work with, and always on time. Everything went smoothly, and they paid attention to the small details.