MAV Design & Build

What a Full Roof Replacement Includes (and What Triggers Change Orders)

Deck & Patio Houston TX
Deck & PatioMAV Design & Build — Houston TX✅ Veteran-Owned  ✅ Licensed & Insured  ✅ Free EstimatesGet a Free Quote →
Roof replacement · Houston region
What a Full Roof Replacement Actually Includes

Decking, underlayment, flashing and ventilation are the four things every full replacement has to get right — and where most change orders come from. Here’s the scope, in plain terms, before you sign a contract.

Book a Roof ConsultationCall (832) 532-6829
CoveringUnderlay.DeckingRafters Four layers, one full-replacement scope
Illustration. A house roof with an exploded corner showing the covering, underlayment, decking and rafter layers.
2021 IRC
City of Houston’s adopted residential code edition, effective Jan. 1, 2024
1/150
Base IRC minimum net free attic-ventilation area (of vented floor area)
$1,500–$6,000
MAV’s published add-on when tear-off reveals rotted or soft decking

Sources: up.codes: Houston Residential Code 2021, IRC R806.2, MAV’s roof replacement cost guide. Checked Sept 25, 2026.

What does a full roof replacement scope actually include?

Four things, every time: the decking underneath gets inspected and repaired, new underlayment goes down across the whole roof, flashing is renewed at every chimney, vent and valley, and ventilation is checked against current code — all before the new covering goes on. MAV’s own scope description for a roof replacement names underlayment, decking repair, flashing and ventilation as separate parts of the job, and its pricing guide treats rotted decking as a priced add-on rather than something baked into every quote by default.

Interactive check
Is this normally included in a base roof replacement quote?

Pick an item to see how MAV’s own published scope and pricing treat it:

Usually yes. Full tear-off is the starting point of a replacement, not an add-on.
Often not automatically included. MAV’s own pricing guide lists this as an add-on, roughly $1,500–$6,000, priced once it’s actually visible.
Usually yes for a full replacement. MAV describes underlayment and waterproofing as part of its roof replacement scope.
Usually new, but confirm in writing. Reusing old flashing to save cost is a corner-cut worth asking about directly.
Sometimes a change order. If existing ventilation predates current code and the quote doesn’t mention it, ask before you sign.
Not automatic everywhere. See MAV’s dedicated guide to windstorm (WPI-8) roof certification for these three counties.

This helper summarizes MAV’s own published scope and pricing pages; every project is confirmed in a written, itemized contract.

The four layers under every new roof

Roof covering (shingle, metal, tile or TPO)UnderlaymentDecking (sheathing) — plywood or OSBRafters / trusses A full replacement opens up every layer; a repair usually opens only the damaged area.
Illustration. Typical layers of a sloped roof, not to scale. Materials and fastening depend on the product and the adopted code.
Decking
The plywood or OSB deck fastened to the rafters or trusses. MAV’s scope page describes “roof decking repair and structural preparation” — inspecting and replacing damaged sections once the old roof is off.
Underlayment
The water-resistant layer between decking and covering. MAV describes “high-quality underlayment and waterproofing systems to protect your home from moisture infiltration.”
Flashing
Metal detailing at chimneys, vents and valleys. MAV: “flashing is installed around critical areas such as chimneys, vents, and roof valleys to prevent water penetration.”
Ventilation
Intake and exhaust airflow through the attic. MAV: “we install or upgrade ventilation systems to regulate airflow and temperature within the attic space.”

Flashing and ventilation, in detail

Counter-flashing (into chimney) Step flashing, sideWater diverted down-slope Reused or corroded flashing at chimneys, vents and valleys is a common change-order trigger.
Illustration. Not to scale; a schematic of step flashing and counter-flashing around a chimney.
Ridge vent (exhaust) Soffit ventSoffit vent Intake at the eaves, exhaust at the ridge — undersized or blocked venting is a common upgrade found mid-project.
Illustration. Not to scale; a schematic of soffit intake and ridge exhaust ventilation.

Where change orders actually come from

Base scopeTear-off & haul-awayNew underlaymentNew flashing at penetrationsNew covering material Common change ordersRotted/soft decking foundVentilation upgrade neededCode edition differsWindstorm inspection (3 counties)
Illustration. A simplified comparison; every project’s written contract is the actual scope of record.
TriggerWhat’s usually foundWhat it means for your contract
Rotted or soft deckingThe old covering comes off and the sheathing underneath is soft, delaminated or storm-damaged.MAV’s pricing guide lists this as an add-on, about $1,500–$6,000, priced once it’s visible.
Multiple existing roofing layersSome older roofs carry two layers of shingles.More tear-off and disposal labor than a single-layer removal.
Ventilation below current code or minimumsExisting ridge/soffit venting is undersized or blocked.New vents, added soffit openings, or a ridge-vent upgrade.
Flashing needing full replacement, not reuseCorroded or improperly fastened flashing at chimneys, vents or valleys.New flashing material and added labor at each penetration.
Code edition different from the original quoteThe city or county’s currently adopted code (IRC edition, local amendments) wasn’t confirmed before signing.Extra materials or labor to meet the current requirement, plus a possible permitting delay.
Windstorm (WPI-8) inspection requiredProperty is inside TDI’s designated catastrophe area (Galveston, Brazoria, Chambers counties).Inspection and certificate process — see MAV’s windstorm certification guide.

How a full replacement typically runs

  1. 1
    Before
    Confirm scope and code in writing
    Get decking, underlayment, flashing and ventilation spelled out as line items, and confirm which code edition the quote is built to.
  2. 2
    Before
    Ask the change-order questions
    Use the checklist below so a discovered condition has an agreed process, not a surprise invoice.
  1. 1
    During
    Tear-off and decking inspection
    The old covering comes off and the decking is inspected for the first time — this is when a rotted-decking change order, if any, is identified.
  2. 2
    During
    Underlayment and flashing
    New underlayment goes down across the deck, and flashing is renewed at every chimney, vent and valley.
  3. 3
    During
    Ventilation and covering
    Ventilation is checked or upgraded, then the new covering (shingle, metal, tile or TPO) is installed.
  1. 1
    After
    Final walk-through
    Confirm the completed scope against the written contract, including any signed change orders.
  2. 2
    After
    Warranty documentation
    MAV backs its roof replacements with a 5-year workmanship warranty, in addition to any manufacturer warranty on the roofing material itself.
Full replacement cost range by material (MAV’s published Houston pricing)
Asphalt shingle, 2,500 sf — low: 18kAsphalt shingle, 2,500 sf — low18kAsphalt shingle, 2,500 sf — high: 35kAsphalt shingle, 2,500 sf — high35kMetal standing seam, 2,000 sf — low: 28kMetal standing seam, 2,000 sf — low28kMetal standing seam, 2,000 sf — high: 58kMetal standing seam, 2,000 sf — high58kConcrete tile, 2,000 sf — low: 20kConcrete tile, 2,000 sf — low20kConcrete tile, 2,000 sf — high: 48kConcrete tile, 2,000 sf — high48k
+View as table
ItemValue (k)
Asphalt shingle, 2,500 sf — low18
Asphalt shingle, 2,500 sf — high35
Metal standing seam, 2,000 sf — low28
Metal standing seam, 2,000 sf — high58
Concrete tile, 2,000 sf — low20
Concrete tile, 2,000 sf — high48

Source: MAV Design & Build: Roof Replacement Cost in Houston TX 2026. Gold = low end, blue = high end of MAV’s published range. Checked Sept 25, 2026.

Before you sign: nail these down

Tick each one off as your contractor answers it.

What MAV clients say on Google5.0on Google

Verified Google reviews of MAV Design & Build across our services (kitchens, bathrooms, ADUs, patio covers and more).

“I had a great experience working with this company. From start to finish, the team was professional, reliable, and easy to communicate with.”

Shelbi Barnett · Google review

“MAV Design & Build did an excellent job with our remodeling project. The team was professional, responsive, and paid close attention to the details.”

Cod Applegate · Google review

“Really pleased with my experience with MAV Design & Build. They were professional, easy to work with, and did a great job with the project.”

Sebastian Gonzalez · Google review

“The team was easy to work with, communicated well throughout the project, and paid attention to the small details.”

Rico Wayne · Google review

“Their attention to detail really stood out, and the finished work exceeded our expectations.”

SYLLYMAN · Google review
Read all reviews on Google →

About MAV Design & Build

Veteran-owned
Licensed and insured Texas general contractor.
Houston-region service area
Harris, Fort Bend, Montgomery, Brazoria, Galveston, Chambers and Waller counties, generally within about a 50-mile radius of Houston.
5-year workmanship warranty
On roof replacements, in addition to any manufacturer warranty on the roofing material itself.

Frequently asked questions

What does a full roof replacement include that a repair doesn’t?+
A full replacement strips the roof down to the decking, inspects and repairs that decking, installs new underlayment and flashing across the whole roof, and typically addresses ventilation, before the new covering goes on. A repair only opens the specific damaged area and usually doesn’t touch the rest of the deck.
What is roof decking, and when does it get replaced?+
Decking (also called sheathing) is the wood panel — usually plywood or OSB — fastened to the rafters or trusses that everything else attaches to. It’s inspected once the old roofing material is torn off; MAV’s own pricing guide treats rotted or soft decking found at that point as an add-on, not a default inclusion.
Why does underlayment matter if it’s hidden under the shingles?+
Underlayment is the water-resistant layer between the decking and the visible roof covering. MAV describes it as part of its roof replacement scope as “underlayment and waterproofing systems to protect your home from moisture infiltration” — it keeps working long after it’s out of sight.
What typically triggers a change order on a roof replacement?+
The most common triggers are decking that turns out to be rotted once the old roof is off, ventilation that doesn’t meet current code, flashing that needs full replacement rather than reuse, and a building code edition that differs from what the original quote assumed. Confirming these in writing up front is how you keep them from becoming surprises.
What building code applies to a roof replacement in the Houston area?+
It depends on the city or county. The City of Houston’s currently adopted residential code is the 2021 International Residential Code with local amendments, effective since January 1, 2024. Other cities and counties in MAV’s service area set their own adopted edition, so confirming it with the local permitting office is part of avoiding a change order.
Do I need a windstorm inspection for a roof replacement?+
Only if the property is in a county the Texas Department of Insurance designates for its windstorm inspection program. Galveston, Brazoria and Chambers counties, within MAV’s service area, are fully inside that program — see MAV’s dedicated guide to windstorm (WPI-8) roof certification for what that inspection involves.

Planning a full roof replacement?

Get an itemized scope — decking, underlayment, flashing and ventilation spelled out — before you sign anything.

Book a Roof Replacement ConsultationCall (832) 532-6829

For pricing by material and roof size, see MAV’s roof replacement cost guide. For the full service description, see the roof replacement page and the roofing services overview. If a repair rather than a full replacement may be enough, see roof repair. For Galveston, Brazoria or Chambers County specifically, see the dedicated guide to windstorm (WPI-8) roof certification.

Sources
  1. up.codes: Houston Residential Code 2021 (based on IRC 2021, adopted with amendments, effective Jan. 1, 2024)
  2. up.codes: Houston Residential Code 2021, Chapter 9 — Roof Assemblies (section structure)
  3. up.codes: Houston Residential Code 2021, Chapter 8 — Roof-Ceiling Construction (R806 Roof Ventilation)
  4. up.codes: IRC R806.2 Minimum vent area (base code text, 1/150 ratio)
  5. Professional Engineering Inspections: City of Houston Announces Adoption of 2021 Construction Codes
  6. MAV Design & Build: Roof Replacement in Houston, TX (service scope)
  7. MAV Design & Build: Roof Replacement Cost in Houston TX 2026 (pricing guide)
  8. MAV Design & Build: Roofing Cost in Houston TX (complete 2026 guide)
  9. MAV Design & Build: Roofing services overview

All facts above were checked against these pages on September 25, 2026. Where a fact could not be confirmed on a primary source (for example, the code edition adopted outside the City of Houston, or any Houston-specific amendment to the base ventilation ratio), it was described as a driver without a specific number or left out, rather than estimated — see research.md for the full list.

What Houston Homeowners Say⭐ 5.0  •  Google Reviews
Waseem NaqviApril 2026
★★★★★

I'm extremely satisfied with my kitchen renovation. The entire process was handled with professionalism and precision. The crew was respectful, efficient, and always made sure I was informed every step of the way. The final result — a beautiful, well-designed kitchen with top-quality finishes and excellent craftsmanship.

AviadApril 2026
★★★★★

Love their work, the kitchen turned out amazing and exceeded our expectations. Completed in much shorter time than I thought it would. Can't recommend them enough!!

Dwight HoldenMarch 2026
★★★★★

Great experience working with this company! They remodeled my kitchen and did an amazing job. The team was professional, easy to work with, and always on time. Everything went smoothly, and they paid attention to the small details.