Houston calls its sign-off document a Certificate of Occupancy. Harris County calls its own version a Certificate of Compliance — a different name for unincorporated-area permits. Here is what each office’s own published material actually says about closing out an ADU or garage-conversion rental-unit permit, and what it honestly does not say.
Book a ConsultationCall (832) 532-6829Sources: oce.harriscountytx.gov/Services/Permits/FAQ and houstonpermittingcenter.org/building-code-enforcement/occupancy-inspections. Checked Oct. 12, 2026.
Two offices, two different sign-off documents
Which office has jurisdiction over your ADU or garage-conversion rental unit — the City of Houston or Harris County Engineering — determines not just which permit you pull, but what document (if any) closes it out and what it is called. The two offices do not use the same term, and neither one’s own published material addresses a residential accessory structure the same way it addresses a commercial building.
If you have not yet confirmed which office applies to your property, MAV’s companion guide covers exactly that question: Houston Permitting Center vs. Harris County Engineering. This guide picks up from there — once you know which office applies, here is what finishes the permit.
| City of Houston (incorporated) | Harris County Engineering (unincorporated) | |
|---|---|---|
| Document name | Certificate of Occupancy — per the city’s own page, scoped to commercial buildings | Certificate of Compliance |
| What triggers it | A commercial building or lease space being occupied, or an occupancy-classification change with new approved plans/permits | A valid permit with all required inspections completed and passed; a Fire Marshal inspection for fire-code projects |
| Residential ADU / garage conversion | Not addressed by the city’s own CO page — the permit’s own final-inspection approval is what is documented as closing it out | Issued by the Harris County Permit Office once required inspections (and the Fire Marshal inspection, if applicable) are approved |
| How you request it | Inspections tracked via the PDI system by project number; contact Occupancy Inspections for CO matters | Email Development Inspection to request the Fire Marshal inspection; email Compliance to request the Certificate of Compliance |
| Re-inspection cost | Not stated in the city’s published material for a residential project | First inspection + first re-inspection included in permit fee; $260 per re-inspection after that |
Pick what’s closest to your ADU or garage-conversion rental unit:
Summarizes each office’s own published material as of October 2026; not a substitute for confirming your specific project directly with the permitting office or MAV.
What each office’s own material actually says
Both quotes below are taken directly from each office’s own current web page, checked Oct. 12, 2026 — not from a secondary summary.
+View as table
| Item | Value ($) |
|---|---|
| First inspection + first re-inspection | 0 |
| Each re-inspection after that | 260 |
Source: Harris County Engineering, Permits FAQ (oce.harriscountytx.gov/Services/Permits/FAQ). Checked Oct. 12, 2026.
How a close-out actually comes together
- 1ConfirmConfirm which office has jurisdictionHouston’s incorporated city limits route to the Houston Permitting Center; unincorporated Harris County routes to Harris County Engineering. See MAV’s companion guide if this isn’t already clear for your property.
- 2BuildBuild to the approved permitConstruction begins once permits are obtained — Harris County’s FAQ states this directly; the same principle governs City of Houston permits.
- 3ScheduleSchedule required inspectionsHouston: tracked via the PDI system by project number. Harris County: email Development Inspection to request a Fire Marshal inspection on fire-code projects.
- 4PassPass every required inspectionA Harris County Certificate of Compliance explicitly requires ALL required inspections completed and passed — not just the final one. Budget for the possibility of a re-inspection (Harris County: $260 after the first free one).
- 5Close outClose out the permitHouston: the permit closes out on final-inspection approval through PDI. Harris County: email Compliance to request the Certificate of Compliance once the Fire Marshal inspection (if applicable) is approved.
Tick each one off as your contractor answers it.
Based on each office’s own published material as of October 2026. Always confirm your specific project’s requirements directly with the permitting office.
Verified Google reviews from MAV ADU-construction clients, plus one general design-build review labeled “across our services” — no garage-conversion-specific review exists in the verified set yet.
“I had a great experience with Mav building my ADU. The entire process was smooth, professional, and much easier than I expected. Their team was responsive, transparent, and kept me informed every step of the way.”
“Just completed my ADU with MAV great experience from start to finish highly recommend working with shon very professional”
“Really pleased with my experience with MAV Design & Build. They were professional, easy to work with, and did a great job with the project.”
About MAV Design & Build
Frequently asked questions
Does a residential ADU or garage conversion get a "Certificate of Occupancy" in the City of Houston?+
What is a "Certificate of Compliance," and how is it different from a Certificate of Occupancy?+
Does an ADU or garage-conversion rental unit count as a "fire code project" in Harris County?+
What does a re-inspection cost in Harris County if the first one doesn’t pass?+
Who do I contact to schedule an inspection?+
How do I know whether my project falls under the City of Houston or Harris County?+
Planning an ADU or garage conversion in Houston?
MAV confirms which office has jurisdiction over your property, manages the inspection schedule, and tells you exactly what closes your permit out — before you assume it’s finished.
Book a ConsultationCall (832) 532-6829For ADU design and construction, see MAV’s ADU construction hub. For garage conversions, see MAV’s garage conversion hub and the garage conversion ADU guide. For which office has jurisdiction over your property, see Houston Permitting Center vs. Harris County Engineering. Final inspection also covers the garage’s fire-rated separation and the smoke/CO alarm placement a conversion triggers — see MAV’s guide to garage conversion fire separation, smoke & CO alarm requirements. Once your permit closes out, see MAV’s guide to property taxes and appraisal after an addition in Texas. If this is a conversion that was never permitted in the first place, see MAV’s guide to unpermitted garage conversion disclosure & risk.
- Harris County Engineering, Office of the County Engineer — Permits FAQ
- Harris County Engineering Permits Office — Fee Schedule (re-inspection fees)
- Houston Permitting Center — Occupancy Inspections (Certificate of Occupancy)
- Houston Permitting Center — homepage / inspection-status tools
- MAV Design & Build: Houston Permitting Center vs. Harris County Engineering
- MAV Design & Build: ADU Construction
- MAV Design & Build: Garage Conversions
Two residential-specific Houston Permitting Center URLs returned HTTP 404 during this research and were not substituted with an assumed fact; the city’s own Certificate of Occupancy page’s commercial-only scope is disclosed above rather than extended to residential ADUs/garage conversions by assumption. Checked October 12, 2026.
I'm extremely satisfied with my kitchen renovation. The entire process was handled with professionalism and precision. The crew was respectful, efficient, and always made sure I was informed every step of the way. The final result — a beautiful, well-designed kitchen with top-quality finishes and excellent craftsmanship.
Love their work, the kitchen turned out amazing and exceeded our expectations. Completed in much shorter time than I thought it would. Can't recommend them enough!!
Great experience working with this company! They remodeled my kitchen and did an amazing job. The team was professional, easy to work with, and always on time. Everything went smoothly, and they paid attention to the small details.