Which permit applies to your remodel, what it costs, and how long the City says it takes — straight from the Houston Permitting Center’s and Harris County’s own permit pages, not a generic estimate.
Book a Remodeling ConsultationCall (832) 532-6829
Sources: Houston Permitting Center, Residential Remodel Permit and Homeowner’s Plumbing Permit (fetched live, HTTP 200 — no longer 403ing automated tools; figures unchanged). Checked Nov. 21, 2026.
Which permit does your project need?
Houston has no zoning, but it does require permits — and which one depends on what you’re actually doing, not on the room. A cosmetic refresh is treated differently than a structural change, and plumbing/electrical/HVAC work each has its own permit track. Answer the question below for a starting point, then confirm with the Permitting Center before you finalize plans. Outdoor structures have their own rules; for walls, see whether you need a permit for a retaining wall in Houston and the 4-foot height rule.
Pick what best describes your project:
General guidance based on the City of Houston and Harris County sources cited throughout this guide — not a permit determination for your specific address.
What the City’s own permit pages actually say
Rather than paraphrase, here is each permit’s own description, fee, and posted processing time.
| Permit | What it covers (City’s words) | Fee (+ $33.56 admin) | Posted processing time |
|---|---|---|---|
| Residential Remodel Permit | “New homes or residential accessory structures, remodel or conversion of existing buildings or additions to existing buildings.” | See City fee schedule | 1–15 business days |
| Residential Addition Permit | “Residential accessory structures, remodel or conversion of existing buildings or additions to existing buildings.” | See City fee schedule | 10 business days |
| Homeowner’s Plumbing Permit | Owner-occupant does their own plumbing work on their homestead. | $86.39 minimum ($116.11 total) | 1 business day |
| Electrical Fixture Permit | Installing, moving, rewiring, repairing, or replacing a lighting fixture/luminaire; registered contractor applies. | $1.34 each, $91.06 minimum | Same-day online or counter service |
| Alteration of HVAC (mechanical) | Modifying/altering an existing HVAC system by adding or removing parts/equipment. | 2% of job cost + $47 | Up to 1 hour |
| New Complete HVAC System | All equipment and ductwork installed or replaced. | $11.41/ton + $47 | Up to 1 hour |
+View as table
| Item | Value (business days) |
|---|---|
| Homeowner’s Plumbing Permit | 1 |
| Residential Addition Permit | 10 |
| Residential Remodel Permit (up to) | 15 |
Source: Houston Permitting Center, Homeowner’s Plumbing Permit, Residential Addition Permit, and Residential Remodel Permit (fetched live, HTTP 200 — no longer 403ing automated tools; figures unchanged). Over-the-counter trade permits (electrical, mechanical) post in minutes to about an hour and aren’t on the same business-day scale, so they’re shown in the table above instead of this chart. Checked Nov. 21, 2026.
All six permits above keep the same $33.56 admin fee and require inspection; only the Homeowner’s Plumbing Permit skips plan review. Statutory authority for the Remodel and Addition permits is the City of Houston Residential Code (Houston Code of Ordinances, Chapter 10) — the same chapter the City’s own consumer brochures cite when explaining why permits are required (see “What happens if you skip a permit” below).
Permits by project type
- 1If you’re changing structureBuilding permitRemoving or adding a wall, or adding square footage, falls under the City’s Residential Remodel or Addition Permit — both require plan review and inspection per the City’s own permit pages.
- 2If you’re moving the sink or adding circuitsPlumbing & electrical permitsMoving a sink or adding island plumbing runs through a plumbing permit; new circuits or fixtures for appliances need an electrical permit (fixture, outlet, or circuit-panel depending on scope), pulled by your registered contractor.
- 1Fixtures & drainsPlumbing permitRelocating fixtures, new supply or drain runs, or converting a tub to a shower with drain changes are plumbing-permit territory — a Homeowner’s Plumbing Permit if you qualify and do the work yourself, otherwise your licensed plumber pulls it.
- 2VentilationMechanical permit (if ducted)Adding or altering exhaust ductwork tied into HVAC falls under the City’s Alteration of HVAC mechanical permit.
- 1The core permitResidential Addition PermitThe City’s own page posts a 10 business day processing time for this permit — plan review and inspection are both required, and the permit is valid 6 months.
- 2Don’t skip theseDeed restrictions & parkingA second-story addition or new footprint can intersect deed restrictions (enforced by the City, verified through the Harris County Clerk) and Houston’s off-street parking ordinance (Chapter 26) if it changes covered parking.
- 1EligibilityHomeowner’s Plumbing PermitYou must own, occupy, and have the property registered as your homestead, and perform the work yourself — per the City’s own permit description.
- 2What you needApplication + IDApplication CE-1284, a driver’s license or proof of homestead, and payment of the $116.11 total minimum fee. No plan review is required; processing posts at 1 business day, valid for 180 days.
Tick each one off as your contractor answers it.
Sources: Houston Permitting Center, Harris County Clerk, and City of Houston Code of Ordinances Chapter 19 (all linked above and in Sources below).
Outside Houston? Harris County’s unincorporated-area rules
If your address isn’t inside the City of Houston, Harris County’s Office of the County Engineer — not the Houston Permitting Center — is your permitting office.
| Question | What Harris County’s own page says | Source |
|---|---|---|
| When is a permit required? | “A permit is needed for all development within Harris County.” Development is defined as “any man-made change to improved or unimproved real estate, including but not limited to buildings or other structures… grading, paving, excavation.” | Harris County Office of the County Engineer, Permits FAQ |
| Is a demolition permit required? | “No demolition work permit is required within the unincorporated area of Harris County. A permit will be required to construct or develop the property after demolition work is completed.” | Harris County Office of the County Engineer, Permits FAQ |
| Floodplain | If a property’s lowest adjacent grade sits below the base flood elevation, additional submittals (accurate site plan, engineer-stamped drawings) are required before a permit is issued. | Harris County Office of the County Engineer, Permits FAQ |
Every FAQ answer on Harris County’s permits page is scoped to “the unincorporated area of Harris County” — confirmation that this is a separate permitting track from the City of Houston’s, not an additional layer on top of it. Confirm your specific parcel’s jurisdiction before applying to either office.
If your project is in a coastal county requiring windstorm certification (Galveston, Brazoria, or Chambers), that’s a separate process from either office above — see our roof replacement & windstorm certification guide if that applies to your project.
What happens if you skip a permit?
The City of Houston’s own consumer guidance is direct about why permits matter. A City of Houston Planning & Development Department permit brochure states: “Why get a permit? It’s the law. State Building Code and the City of Houston’s Code of Ordinances require building permits to be obtained for new construction within the City of Houston. If the City is alerted of an unpermitted [structure], the property owner will be required to comply with all city codes.” Its own stated reasons for getting a permit include: “Ensure a safe structure,” “Avoid red tags and double permit fees,” “Comply with deed restriction,” and “Ensure building line compliance.”
The Residential Remodel and Addition permits cite the City of Houston Residential Code (Houston Code of Ordinances, Chapter 10) as their statutory authority — the same chapter that governs building compliance generally. We could not independently verify an exact fine amount or penalty schedule for unpermitted work in the time available for this guide, so none is stated here; ask the Permitting Center for current specifics if that’s a concern for your project.
Real remodeling work that needed these permits




These verified Google reviews are across our services, not permit-specific — shown here for the same trust signal at the same visual standard as our other guides.
“I had a great experience working with this company. From start to finish, the team was professional, reliable, and easy to communicate with.”
“They were easy to communicate with, showed up on time, and made sure everything was done properly.”
“Really pleased with my experience with MAV Design & Build. They were professional, easy to work with, and did a great job with the project.”
“The team was easy to work with, communicated well throughout the project, and paid attention to the small details.”
“They were honest about pricing, communicated well, and delivered exactly what they promised.”
About MAV Design & Build
Frequently asked questions
Do I need a permit to remodel my house in Houston?+
How long does a Houston remodeling permit take?+
Can I pull my own plumbing permit as a homeowner?+
What happens if I skip a permit in Houston?+
Is my remodel permitted by the City of Houston or by Harris County?+
Do deed restrictions or parking rules affect a Houston remodel?+
Not sure which permit your remodel needs?
MAV pulls the correct City of Houston or Harris County permits as part of every remodel we build — kitchens, bathrooms, additions, and whole-home renovations.
Book a Remodeling ConsultationCall (832) 532-6829For the short-form version of this guide, see Houston remodeling permits. If your project is a garage-to-ADU conversion, our garage conversion to ADU guide covers that permit path specifically. For whole-home projects that touch multiple permit types at once, see complete home renovations.
- Houston Permitting Center: Residential Remodel Permit (HPWCODE1135)
- Houston Permitting Center: Residential Addition Permit (HPWCODE1134)
- Houston Permitting Center: Homeowner’s Plumbing Permit (HPWCODE1099)
- Houston Permitting Center: Electrical Fixture Permit (HPWCODE1054)
- Houston Permitting Center: Alteration of HVAC (HPWCODE1019)
- Houston Permitting Center: New Complete HVAC System (HPWCODE1024)
- City of Houston Planning & Development Department: "Want to Build a Carport?" permit brochure
- Harris County Office of the County Engineer: Permits
- Harris County Office of the County Engineer: Permits FAQ
- City of Houston Legal Department: Deed Restrictions, Frequently Asked Questions
- City of Houston Planning & Development: Off-Street Parking Ordinance
- Houston Code of Ordinances: Chapter 19, Flood Plain
- Harris County Clerk’s Office: Real Property Records
All facts above were checked against these sources on September 25, 2026. The Houston Permitting Center’s live pages return HTTP 403 to automated fetches; the six permit pages cited were captured via the Wayback Machine on the same date. The Harris County Office of the County Engineer pages were fetched live with no block. Where a fact could not be confirmed on a primary source (for example, an exact unpermitted-work penalty figure), it was left out of this article rather than estimated.
I'm extremely satisfied with my kitchen renovation. The entire process was handled with professionalism and precision. The crew was respectful, efficient, and always made sure I was informed every step of the way. The final result — a beautiful, well-designed kitchen with top-quality finishes and excellent craftsmanship.
Love their work, the kitchen turned out amazing and exceeded our expectations. Completed in much shorter time than I thought it would. Can't recommend them enough!!
Great experience working with this company! They remodeled my kitchen and did an amazing job. The team was professional, easy to work with, and always on time. Everything went smoothly, and they paid attention to the small details.