What an accessory dwelling unit actually costs to build in the Houston area, using MAV Design & Build’s own published cost ranges by finish scope, and what Houston’s own Chapter 42 ordinance says about size and parking.
Get an ADU Cost EstimateCall (832) 532-6829
Sources: MAV’s Garage Conversion to ADU guide; Houston Code of Ordinances, Chapter 42, Sec. 42-1; Houston Permitting Center, Residential Remodel Permit. Checked Sept. 26, 2026.
Two ways to get an ADU — and why cost differs
An ADU can start from an existing structure — a garage, most often — or from an empty part of the lot. Converting reuses a foundation, walls and roof that a ground-up build has to construct from scratch, which is why MAV’s own published guide prices a garage-conversion ADU starting at $18,000, while a ground-up detached ADU has no published fixed range: every cost driver below starts from zero instead of an existing structure.
Pick the option that best describes your project:
ADU cost by finish scope
MAV’s own published cost ranges for an ADU converted from an existing garage — see MAV’s Garage Conversion to ADU guide for the full breakdown.
- 1MAV’s published range$18,000 – $40,000No plumbing added — drywall, insulation, flooring, a window and an entry door. Source: MAV’s Garage Conversion to ADU guide.
- 1MAV’s published range$38,000 – $75,000Adds a full bathroom, plus the plumbing and electrical to support it. Source: MAV’s Garage Conversion to ADU guide.
- 1MAV’s published range$60,000 – $130,000A complete rentable or in-law unit — kitchen, bathroom, mini-split HVAC and finishes. Source: MAV’s Garage Conversion to ADU guide.
MAV’s published cost range, by scope
Ceiling of MAV’s published range for a garage-conversion ADU, by finish scope.
+View as table
| Item | Value (K) |
|---|---|
| Basic studio / home office | 40 |
| Guest suite with bathroom | 75 |
| Full apartment with kitchen | 130 |
Source: MAV Design & Build, Garage Conversion to ADU guide, itself sourced to MAV’s Garage Conversion Cost guide. Checked Sept. 26, 2026.
What actually moves your cost tier
Rather than a single number, here is what pushes a project up or down MAV’s published range.
| Cost driver | Effect on your number | Basis |
|---|---|---|
| Existing garage or structure to reuse | Puts you inside MAV’s published $18,000–$130,000 conversion range instead of ground-up pricing | MAV’s Garage Conversion to ADU guide |
| No plumbing added (studio/home office) | Low end of the range: $18,000–$40,000 | MAV’s Garage Conversion to ADU guide |
| One bathroom added (guest suite) | $38,000–$75,000 | MAV’s Garage Conversion to ADU guide |
| Full kitchen plus bathroom (rentable apartment) | $60,000–$130,000, the top of MAV’s published range | MAV’s Garage Conversion to ADU guide |
| Detached structure vs. attached | Adds $3,000–$12,000 for longer electrical, plumbing and HVAC runs from the main house | MAV’s Garage Conversion Cost guide |
| No existing structure (ground-up build) | Outside MAV’s published conversion range — new foundation, framing and roof priced individually | MAV has not published a fixed ground-up range (research.md) |
The line items behind the range
All four figures are MAV’s own published numbers — see MAV’s Garage Conversion to ADU guide and MAV’s Garage Conversion Cost guide for the full breakdown by project scope.
What Houston’s Chapter 42 actually says
Rather than paraphrase, here is what the ordinance itself says — quoted, not summarized.
| Topic | What Chapter 42 says | Source |
|---|---|---|
| Size cap | “A lot upon which is located a free-standing building containing one dwelling unit and a detached secondary dwelling unit of not more than 1,500 square feet also shall be considered single-family residential.” | Houston Code of Ordinances, Ch. 42, Sec. 42-1 |
| Parking | Per the City’s Livable Places User Guide, parking for a secondary dwelling unit is based on unit size: one additional off-street parking space is required only if the unit is between 1,001 and 1,500 gross square feet, or if the main house itself doesn’t meet its own parking requirement; a unit of 1,000 square feet or less needs no additional space. | Houston Code of Ordinances, Ch. 42, Sec. 42-187 |
| Lot coverage | No general lot-coverage percentage for a secondary dwelling unit appears anywhere in the 141-page ordinance. | MAV’s Houston ADU Regulations guide (full-text search, checked Sept. 25, 2026) |
| Side/rear setback | No general side or rear setback figure for a secondary dwelling unit; placement is governed by the Construction Code and any deed restrictions. | MAV’s Houston ADU Regulations guide |
| Height | No height limit for a secondary dwelling unit; governed by the adopted Construction/Building Code and deed restrictions, confirmed at plan review. | MAV’s Houston ADU Regulations guide |
| Deed restrictions | “The City of Houston is not zoned” — the City and State instead authorize enforcement of recorded deed restrictions, which vary by subdivision and sometimes by section or lot. | City of Houston Legal Department |
Chapter 42 text quoted from the City’s own redline ordinance PDF (Wayback Machine capture; the live page returns HTTP 403 to automated fetches), as verified in MAV’s Houston ADU Regulations guide research pass, checked Sept. 25, 2026. Earlier, unsourced figures for lot coverage (60–70%), setbacks (3–5 ft), and height (35 ft) were removed sitewide on Sept. 26, 2026 and are not restated here.
Real MAV ADU projects in Houston




Tick each one off as your contractor answers it.
Sources: Harris County Clerk, City of Houston Legal Department, Houston Code of Ordinances Chapter 42, and MAV Design & Build (all linked above and in Sources below).
Omer Ahmed and Sam Nogroski’s reviews are about their ADU projects with MAV; the others are verified Google reviews across our services.
“I had a great experience with Mav building my ADU. The entire process was smooth, professional, and much easier than I expected. Their team was responsive, transparent, and kept me informed every step of the way.”
“Just completed my ADU with MAV great experience from start to finish highly recommend working with shon very professional”
“I had a great experience working with this company. From start to finish, the team was professional, reliable, and easy to communicate with.”
“MAV Design & Build did an excellent job with our remodeling project. The team was professional, responsive, and paid close attention to the details.”
About MAV Design & Build
Frequently asked questions
How much does an ADU cost to build in Houston?+
What is the cheapest way to add an ADU in Houston?+
Does Houston limit how big an ADU can be?+
Does Houston require extra parking for an ADU?+
Does Houston cap lot coverage, setbacks, or height for an ADU?+
Is an ADU a good investment in Houston?+
Ready to price out your Houston ADU?
Tell us which scope and which path — conversion or ground-up — and get a fixed-price estimate before you commit.
Get an ADU Cost EstimateCall (832) 532-6829For the full process behind a garage-to-ADU conversion — permits, parking and floodplain rules — see MAV’s Garage Conversion to ADU guide and its dedicated Garage Conversion Cost guide. For zoning-adjacent questions — size caps, parking, and what Chapter 42 does and does not restrict — see MAV’s Houston ADU Regulations guide. MAV’s ADU construction services cover both a detached ADU and an attached ADU, with a dedicated page for a garage ADU conversion.
- MAV Design & Build: Garage Conversion to ADU in Houston, Complete Guide
- MAV Design & Build: Garage Conversion Cost in Houston TX, Complete 2026 Guide
- MAV Design & Build: Houston ADU Regulations 2026 (Chapter 42 breakdown)
- Houston Code of Ordinances, Chapter 42 (Development), Sec. 42-1 and Sec. 42-187
- Houston Permitting Center: Residential Remodel Permit (HPWCODE1135)
- Houston Permitting Center: Residential Addition Permit (HPWCODE1134)
- City of Houston Legal Department: Deed Restrictions, Frequently Asked Questions
- Harris County Clerk’s Office: Real Property Records
- HUD: FY2026 Fair Market Rents, Houston-The Woodlands-Sugar Land, TX HUD Metro FMR Area
Cost figures were verified live on MAV’s own Garage Conversion to ADU guide on September 26, 2026. Chapter 42 facts were verified against the City’s own ordinance text in a prior research pass (ops/content/houston-adu-regulations-2026/research.md), checked September 25, 2026 — the City’s live permitting pages return HTTP 403 to automated fetches and were captured via the Wayback Machine. Where a fact could not be confirmed on a primary source, it was left out of this article rather than estimated.