
Houston usually will not assign a backyard ADU its own street address unless it has its own electric meter. Here is exactly what the City requires, what CenterPoint Energy’s own meter-set process looks like, and the real cost drivers — sourced directly, no invented numbers.
Book a ConsultationCall (832) 532-6829Sources: Maxable Houston ADU guide (maxablespace.com, direct quote) and CenterPoint Energy’s own published new-service process (corroborated via 1776energyllc.com and a direct site-search snippet — centerpointenergy.com blocked automated fetch). Checked Oct. 13, 2026.
One meter or two? What actually decides it
A detached ADU can legally run off the main house’s existing electrical service, or get its own dedicated meter — both are normal, and the right answer depends on what the unit is for. A family guest suite or a short-term setup rarely needs the extra cost and trenching of a second meter. A long-term rental unit usually does, for two reasons: it gives the tenant their own, separately-billed utility account, and it is what typically qualifies the unit for its own City of Houston street address instead of sharing the main home’s.
| Shared meter (one service) | Separate meter (two services) | |
|---|---|---|
| Electric billing | One bill for the whole property — landlord typically absorbs or estimates the ADU’s usage | ADU is billed separately — a tenant can enroll with their own Retail Electric Provider |
| Street address | ADU mail/correspondence generally goes to the main house’s address | Typically what makes the ADU eligible for its own separate address |
| Upfront cost | No new meter, trenching, or CenterPoint connection fee | Trenching/conduit run, possible panel upgrade, and CenterPoint’s own connection/inspection fees (see cost drivers below) |
| Best fit | Family guest suite, home office, short-term/occasional use | Long-term rental unit, in-law suite you want billed independently |
Pick what’s closest to your plan for the unit:
General guidance based on currently published sources as of October 2026 — always confirm your specific property’s requirement with the City and with CenterPoint Energy.
What Houston requires for a separate address
The City’s own address-assignment pages were not directly reachable by this research (automated fetch blocked, same pattern documented across MAV’s prior guides) — the rule below is sourced to a secondary/trade source quoting it directly, disclosed rather than presented as a primary-site read.
The CenterPoint Energy process, step by step
- 1CallGet an Electric Service Identifier (ESI ID)Call CenterPoint Energy at (713) 207-2222 to obtain the ESI ID for the new meter location — the identifier every later step references.
- 2PreparePrepare the siteBefore requesting the meter: the address must be marked at the site/meter can, the meter can and load wires installed, and a ground rod connected — per CenterPoint’s own published pre-request requirements.
- 3SubmitGet local permits, then submit the Electric Service RequestObtain the required local electrical permit, then submit through CenterPoint’s online Electric Service Request (ESR) portal.
- 4ContactA Service Consultant reaches outA local CenterPoint Service Consultant contacts you within 2 business days of the request to confirm details.
- 5InstallMeter is installedCenterPoint typically installs the meter 3 to 5 business days after the requested start date, weather and workload permitting. Allow 2 more business days after the ESI ID is active before enrolling the new meter with a Retail Electric Provider.
+View as table
| Item | Value (business days) |
|---|---|
| Service Consultant contacts you | 2 |
| Meter installed (typical) | 5 |
Source: CenterPoint Energy’s published new-service process, corroborated via 1776energyllc.com and a direct search-indexed snippet (centerpointenergy.com itself blocked automated fetch). Checked Oct. 13, 2026. Figures are upper-bound/typical, not guaranteed.
Real cost drivers — no invented numbers
MAV has not found a reliable, Texas-specific, primary-sourced dollar figure for a standalone ADU meter-separation line item — published ranges online are overwhelmingly California-based. Here is what actually drives the cost instead.
These are planning and budgeting line items on top of — not included in — MAV’s published ADU construction cost tiers. See MAV’s ADU cost guide for the full construction cost ranges (Basic Studio/Home Office, Guest Suite with Bath, Full ADU Apartment with Kitchen) and Houston ADU Regulations for the Chapter 42 size, parking, and setback rules that shape the rest of the project.
Tick each one off as your contractor answers it.
Based on CenterPoint Energy’s and the City of Houston’s own published processes as of October 2026. Always confirm your specific project’s requirements directly.
Verified Google reviews from MAV ADU-construction clients — no utility-separation-specific review exists in the verified set yet.
“I had a great experience with Mav building my ADU. The entire process was smooth, professional, and much easier than I expected. Their team was responsive, transparent, and kept me informed every step of the way.”
“Just completed my ADU with MAV great experience from start to finish highly recommend working with shon very professional”
“Really pleased with my experience with MAV Design & Build. They were professional, easy to work with, and did a great job with the project.”
About MAV Design & Build
Frequently asked questions
Does my Houston ADU need its own electric meter?+
What is an Electric Service Identifier (ESI ID), and why do I need one?+
How long does CenterPoint take to set a new meter?+
How much does a second electric meter cost for an ADU in Houston?+
Does a separate meter mean a separate permit?+
What else should I plan for Chapter 42 compliance on the ADU itself?+
Planning an ADU rental unit in Houston?
MAV plans the electrical scope — shared or separate meter — as part of your ADU’s design, and coordinates permitting and construction from there.
Book a ConsultationCall (832) 532-6829For ADU design and construction, see MAV’s ADU construction hub. For the full Chapter 42 rules, see Houston ADU Regulations. For construction cost tiers, see MAV’s ADU cost guide. For what closes out the permit once construction is done, see Certificate of Occupancy vs. Final Inspection. For the separate question of what it costs to tie that same ADU into municipal water and sewer service, see MAV’s guide to ADU water and sewer tap and impact fees.
- Maxable — Everything You Need to Know About ADUs in Houston (City address-assignment rule, direct quote)
- 1776 Energy LLC — Electric Meter Installation in Texas (CenterPoint process corroboration)
- CenterPoint Energy — Starting New Electric Service (primary source; direct automated fetch blocked, corroborated via indexed snippet + the trade source above)
- MAV Design & Build: Houston ADU Regulations
- MAV Design & Build: ADU cost guide
- MAV Design & Build: ADU Construction
Checked October 13, 2026. CenterPoint Energy’s own site blocked automated fetch (HTTP 403) — its process figures are corroborated via two independent sources rather than a direct primary-site read, disclosed rather than presented otherwise.
I'm extremely satisfied with my kitchen renovation. The entire process was handled with professionalism and precision. The crew was respectful, efficient, and always made sure I was informed every step of the way. The final result — a beautiful, well-designed kitchen with top-quality finishes and excellent craftsmanship.
Love their work, the kitchen turned out amazing and exceeded our expectations. Completed in much shorter time than I thought it would. Can't recommend them enough!!
Great experience working with this company! They remodeled my kitchen and did an amazing job. The team was professional, easy to work with, and always on time. Everything went smoothly, and they paid attention to the small details.