
Houston regulates exterior changes — including additions — to homes inside its designated historic districts and to individually designated landmarks. This page works through the City’s own Certificate of Appropriateness (COA) process: what triggers it, what’s exempt, what an application needs, and whether any MAV service-area location is actually inside one of these districts.
Request a Free EstimateCall (832) 532-6829Illustration. A COA review looks at what’s visible from the public street — a rear addition hidden from view is often exempt.
Sources: City of Houston Planning & Development Department, Office of Preservation (houstontx.gov/planning/HistoricPres) and COA Process flowchart. Checked Nov. 12, 2026.
A short MAV reel on choosing materials and finishes that work together — the same kind of before/after material comparison a historic-district COA application has to document.
What the video shows: A 29-second MAV Design & Build reel on planning finishes and layout connections for a project: a kitchen showroom tour, close-ups of cabinetry, countertop and lighting combinations, and concept diagrams on planning room connections and material/finish proportions. Burned-in captions; scenes are labelled in the video as supplied design concept, supplied project footage and concept diagram illustrations — not a single finished project.
What actually triggers a COA
A Certificate of Appropriateness is Houston’s approval for exterior work, new construction, relocation or demolition affecting a property that is a designated landmark, a protected landmark, or located inside one of the City’s designated historic districts. For a room addition, that means: if the house is inside a historic district or is itself designated, the addition’s exterior — massing, roofline, materials and anything visible from the public street — goes through city review before MAV or any contractor can build it.
City staff first decide whether a project qualifies for administrative approval or needs full review by the Houston Archaeological and Historical Commission (HAHC). The HAHC can approve, deny or defer an application; a denial can be appealed to the Historic Preservation Appeals Board (HPAB), which can reverse or uphold the HAHC’s decision. Applications are submitted through the City’s Historic Preservation Tracker (HPT) portal.

A finished exterior wall and side walkway — the kind of street-facing surface a historic-district review looks at before work starts.




Houston’s preservation program, by the numbers
+View as table
| Item | Value |
|---|---|
| Designated historic districts | 23 |
| Protected landmarks | 213 |
| Landmarks (all designations) | 305 |
Source: City of Houston Planning & Development Department, Office of Preservation (houstontx.gov/planning/HistoricPres), as of January 2026. Checked Nov. 12, 2026.
9 kinds of work that don’t need a COA
The City’s own exemption list — confirm any specific project directly with the Office of Preservation before assuming it qualifies.
| # | Exempt from a Certificate of Appropriateness |
|---|---|
| 1 | Interior alterations, and rear building changes not visible from the street |
| 2 | Rebuilding due to destruction by natural disaster |
| 3 | Ordinary maintenance & repair |
| 4 | Gutters, downspouts, storm windows/doors, window screens, screen doors, temporary weather protections |
| 5 | Porch ceiling fans, light fixtures, HVAC units, landscaping & fences |
| 6 | Removal of burglar bars, satellite dishes, free-standing signs, ramps and lifts |
| 7 | Solar panels or other roof equipment installed on the rear half of the roof |
| 8 | Paint colors, paint on previously painted surfaces |
| 9 | Demolition of a non-contributing structure |
Source: City of Houston Planning & Development Department’s COA Process flowchart, checked Nov. 12, 2026. Note item 1: a rear addition genuinely not visible from a public street can fall under this exemption — alleys don’t count as the public street for this purpose.

A tiled shower wall, photographed close — the kind of material detail an application’s written description and photos document for any project.
Deferral rule: if the HAHC doesn’t act on an application within its next two regular meetings after a first deferral (three meetings total), the application is deemed approved — unless the applicant has consented in writing to extend the timeline. That protects a homeowner from an application sitting indefinitely without a decision.
What a COA application actually has to include
Source: City of Houston’s COA Checklist (1/5/2021). Applications go through the City’s Historic Preservation Tracker (HPT) at cohweb.houstontx.gov/hpt/ — MAV doesn’t file on a homeowner’s behalf, but the existing-and-proposed drawings a COA asks for (item 3) are the same kind of plans MAV’s Room Addition 3D Design process produces before construction.

A finished kitchen addition — documenting current conditions with labelled photos is the first step on MAV’s Certificate of Appropriateness checklist.
Is your project likely exempt or reviewed?
Pick the closest description — this is a general guide, not a determination; the Office of Preservation makes the actual call.

Existing and proposed conditions, photographed and drawn at the same scale, are what a review board asks to see before approving a change.

A hallway opening into a sunroom addition. Where the new structure sits relative to the street, and how visible it is, shapes whether a review focuses on it at all.

An entry hallway inside a finished home — the kind of interior circulation space a historic-district review never touches.
Are any of MAV’s service areas affected?
Checked against the City’s own district roster, not assumed.
The City of Houston’s own designated-landmarks roster names its historic districts individually. MAV cross-checked every one of the 142 Appendix C locations it serves — across Harris, Fort Bend, Montgomery, Brazoria, Galveston, Chambers and Waller counties, plus the owner-added premium areas — against that list, matching on name.
Result: zero matches. Every MAV service-area location is either an independently incorporated city (e.g. Bellaire, West University Place, Piney Point Village) with its own government, an unincorporated subdivision or master-planned community outside Houston’s historic-preservation ordinance entirely, or — where it is inside Houston’s own footprint (River Oaks, Tanglewood, Southampton, Afton Oaks, Rock Creek) — a deed-restricted neighborhood that is not on the City’s historic-district roster, which is a separate thing from a deed restriction or a civic-association name. That’s why this page covers the citywide process rather than naming any specific MAV service area as historic.
If your own home happens to be inside one of the City’s 23 designated districts regardless of area, the same COA process above applies to it. Source: City of Houston designated-landmarks roster (2010 roster, 16 districts + 3 then-pending — all since designated, consistent with the current count of 23 in the live department page), checked Nov. 12, 2026.
MAV’s verified review set does not yet include a project specifically inside a designated historic district. These are verified Google reviews from MAV clients on material selection and process — the themes this page covers.
“Love my new kitchen! Smooth process, good communication, and the final result speaks for itself.”
“I recently had my kitchen remodeled by this company, and I’m extremely happy with how everything turned out. The cabinets, countertops, and finishes all came together perfectly.”
“I love my new patio cover!! It’s a great, very professional company, they did everything from A to Z.”
About MAV Design & Build
Frequently asked questions
Do I need city approval to add onto a historic home in Houston?+
What is a Certificate of Appropriateness (COA)?+
Does a rear addition that isn’t visible from the street still need a COA?+
What does a Certificate of Appropriateness application need to include?+
Is any MAV service-area city or neighborhood inside a Houston historic district?+
Is a "Heritage District" the same as a historic district?+
Does MAV handle the drawings a COA application asks for?+
Offer shown in the video: a $299 3D Design Package credited back.
Terms, eligibility and how long the offer runs are confirmed by MAV in writing before you sign — ask when you request your estimate. What the video shows: A 44-second MAV Design & Build promotional video on planning a room’s design in 3D before construction — bathroom and kitchen/dining 3D renders and MAV’s current 3D Design Package special.
Ask About This OfferCall (832) 532-6829Related room-addition planning guides
Planning an addition on a historic-district or landmark property?
Tell MAV about your home and what you want to add — we’ll help you plan a design that fits what the City’s review will actually look at, with a free estimate.
Request a Free EstimateCall (832) 532-6829Related MAV pages: Room Additions, Room additions by city, Room Addition 3D Design, comparing addition proposals & contracts and designing an addition that looks original.
- City of Houston Planning & Development Department, Office of Preservation — Historic Preservation home page (23 historic districts, 305 landmarks, 213 protected landmarks, as of January 2026)
- City of Houston — Certificate of Appropriateness (COA) Process flowchart (review path, 9 exemptions, deferral rule)
- City of Houston — Certificate of Appropriateness Checklist, 1/5/2021 (application requirements)
- City of Houston — Current Listing of Designated Landmarks and Protected Landmarks within Designated Historic Districts, Aug. 9, 2010 (district roster used for the zero-overlap check)
- City of Houston — Heritage District page (distinguishes a Heritage District from a designated historic district)
Every figure above was fetched directly from the City of Houston’s own Planning & Development Department pages and PDFs this campaign and read byte-for-byte, not taken from an AI summary. The zero-overlap finding against MAV’s 142 service-area locations is computed in this page’s source code, not typed by hand. Checked November 12, 2026.
I'm extremely satisfied with my kitchen renovation. The entire process was handled with professionalism and precision. The crew was respectful, efficient, and always made sure I was informed every step of the way. The final result — a beautiful, well-designed kitchen with top-quality finishes and excellent craftsmanship.
Love their work, the kitchen turned out amazing and exceeded our expectations. Completed in much shorter time than I thought it would. Can't recommend them enough!!
Great experience working with this company! They remodeled my kitchen and did an amazing job. The team was professional, easy to work with, and always on time. Everything went smoothly, and they paid attention to the small details.