How to Compare Home Addition Proposals and Contracts in Texas

Home Addition Houston TX
Home AdditionMAV Design & Build — Houston TX✅ Veteran-Owned  ✅ Licensed & Insured  ✅ Free EstimatesGet a Free Quote →
Room Additions · Before You Sign
How to Compare Home Addition Proposals and Contracts in Texas

Compare the scope line by line before you compare prices. Three bids for the same addition can differ by tens of thousands of dollars because one includes engineering, permits, the roof tie-in and finishes and another doesn’t. Then check the Texas protections every residential contract should come with: the disclosure statement, subcontractor list, 10% reserve and lien waivers.

Request a Free EstimateCall (832) 532-6829
Proposal A 11 of 11 items namedProposal B 8 of 11 items namedProposal C 4 of 11 items named Same room, three prices: compare the lines, not the totals

Illustration. Same room, three prices — the cheapest proposal usually names the fewest line items.

10% / 30 days
Funds the owner reserves during the work and for 30 days after completion (Prop. Code §53.101)
15 days
Deadline to update the subcontractor & supplier list after a change (§53.256)
4 forms
Statutory lien-waiver forms — conditional/unconditional, progress/final (§53.284)

Sources: Texas Property Code §§53.101, 53.255, 53.256, 53.284 as amended by HB 2237 (87th Leg., effective Jan. 1, 2022). Checked Oct. 25, 2026. This guide is general information, not legal advice.

MAV Design & Build reel · captions burned in · tap to play
Watch
From first conversation to final walkthrough

A complete proposal follows the same path as the project: the first conversation, design decisions, construction stages and the final walkthrough.

What the video shows: A 27-second MAV Design & Build reel walking through the stages a proposal should cover — the first conversation, layout concepts, framing and the final walkthrough. Burned-in captions; scenes are labelled in the video as supplied project footage, design concepts and illustrations.

What should a room addition proposal include?

A complete addition proposal names every phase from drawings to final inspection, says who is responsible for each, and states whether each item is a fixed price or an allowance. If an item is missing, the proposal isn’t cheaper — the cost has just moved to a change order, to you, or to nobody until it becomes a problem.

Line itemWhat a complete proposal saysRed flag if you see
Design & drawingsWho produces plans, how many revisions, and whether a 3D model is includedPlans “by owner” or not mentioned
EngineeringStructural review/stamped design where needed; foundation and framingNo mention on a second-story, over-garage or wall-opening job
Survey & site checksBoundary survey, setbacks, easements, deed restrictions/HOA reviewAssumes your lot can take the footprint
Permits & feesWho applies, which office, and whether fees are in the pricePermit “if required” or “not included”
Demolition & site prepOpening the exterior wall, removals, haul-off, protection of the existing houseNo protection or dust plan for an occupied home
FoundationType, size, how it ties to the existing house; soils assumptionOne lump sum with no description
Framing & roof tie-inWalls, floor/roof system, how the new roof meets the old one, weatherproofingRoof tie-in not described
Exterior matchBrick/siding, roofing, windows matched to the house — or notSilent on matching materials
Mechanical, electrical, plumbingHVAC approach, panel capacity, circuits, plumbing runs for any bathroom“Extend existing” with no capacity check
Insulation & finishesInsulation, drywall, flooring, trim, paint, doors, fixtures — fixed or allowanceFinishes only as vague allowances
Inspections & close-outFinal inspection, as-builts, warranty documents, lien releases at the endNothing after “substantial completion”

A planning list for comparing proposals — not an exhaustive scope for every project. Your project may add items (a bathroom, a balcony, a stair) or drop some.

Navy hexagon tile shower with brass fixtures
MAV project photo
Specialty tile and brass fixtures: a fixed selection or an allowance? The proposal should say which.
Walk-in shower with stone tile and linear drain
MAV project photo
Stone tile, glass and a linear drain — details to see priced in writing before you sign.
Range hood, gas range and stacked-tile backsplash
MAV project photo
Appliance packages vary widely in price; compare the model or allowance each bid carries.

Why prices differ: the usual missing pieces

Design, engineering, permits
“Plans and permits by owner” or “engineering if required” pushes real cost and responsibility back to you. On structural work — a second story, a room over a garage, a removed wall — engineering is not optional.
The connection to the house
Opening the exterior wall, tying the new roof into the old one, matching brick and roofing, and patching the inside of the existing house are where vague proposals save the most on paper.
Systems capacity
“Extend existing HVAC/electrical” assumes your current system and panel can carry the new room. A complete proposal says how that was checked and what happens if it can’t.
Low allowances
An allowance far below what the finishes you want actually cost lowers the bid total and raises your final bill. Ask what product each allowance assumes.
Hidden conditions
Older houses hide rot, undersized framing and plumbing surprises behind the wall you’re opening. A proposal should say how those are found, documented and priced.
Close-out
Final inspection, warranty terms in writing, as-builts and final lien releases cost time. If they aren’t in the proposal, they may not happen.

For how MAV’s published cost ranges are built, see the home addition cost guide and room addition cost guide. For who does what under each delivery model, see design-build vs. general contractor.

White kitchen with island seating and stainless appliances
MAV project photo
A finished kitchen — the end state a complete proposal should describe line by line.

This is the end state a proposal should describe. Every surface in a finished room — cabinets, counters, tile, flooring, fixtures, lighting — is either a named, priced selection or an allowance. Ask each bidder to show which is which.

Even a compact kitchen carries a dozen separate selections. When one bid lists them and another says “kitchen per plan,” you are not comparing the same thing.

Compact kitchen with wood cabinets and subway tile
MAV project photo
Even a compact kitchen has a dozen selections: cabinets, counters, tile, sink, faucet and appliances.

Allowances, selections and change orders

AllowanceA budget placeholder for a finish budgetyou pick lessyou pick more Fixed selectionProduct named and priced up front One known number
Illustration. An allowance is a placeholder budget that moves with what you choose; a fixed selection names the product and its price up front.
Double vanity with black fixtures and framed mirrors
MAV project photo
Vanities, faucets and lighting are finish selections that move a final price up or down.
Sage cabinetry, professional range and tiled backsplash
Cabinetry, appliances and backsplash are classic allowance items — ask what each allowance assumes.
Tiled shower with three recessed niches
Niches, tile patterns and waterproofing details belong in the written scope, not in a verbal promise.
Shower wall with mosaic accent band and niches
An accent tile band and niches — a selection that should be named in the proposal.
Powder room with wallpaper, tile wainscot and pedestal sink
Wallpaper, wainscot tile and fixtures are line items that low bids often leave vague.

For each allowance ask: what product or quality level the number assumes, whether it includes installation, and how the difference is billed (cost plus markup, or at cost). A list of allowance assumptions turns a vague number into something you can compare between proposals.

Selections that are made before the contract is signed can be priced as fixed items. Late selections can delay ordering and the schedule — ask for a selections deadline list tied to the construction sequence.

Every change — yours, or one forced by a hidden condition — should be written before the work is done: description, price or credit, schedule effect, and both signatures. Ask how hidden conditions found when the wall is opened will be documented, with photos, before work continues.

Some homeowners keep a contingency outside the contract for unknowns; some proposals carry one inside. Either way, it should be visible and its use documented by change order, not absorbed silently. How large it should be depends on the age and condition of the house — older homes justify more.

Texas protections that come with every residential contract

Texas Property Code Chapter 53 gives homeowners specific documents and tools. Knowing them makes it easy to spot a contract that skips them.

The disclosure statement (§53.255)
Before you sign a residential construction contract, the original contractor must deliver a “KNOW YOUR RIGHTS AND RESPONSIBILITIES UNDER THE LAW” statement. It tells you to get a written agreement covering the work, the time for completion, the cost or how it’s determined, and the payment method — including reserved funds and conditions for final payment.
Subcontractor & supplier list (§53.256)
Before construction starts, the contractor must give you a written list (name, address, phone) of the subcontractors and suppliers it intends to use, and update it within 15 days of any change. You can waive this only with a specific written waiver — you are not required to.
The 10% reserve (§53.101)
During the work and for 30 days after completion, the owner reserves 10% of the contract price or of the value of work done. In a simple illustration, on a $100,000 contract that is $10,000. The statute and its 2022 amendments use the term “reserved funds.”
Lien waivers (§53.284)
Four statutory forms: conditional and unconditional, for progress and final payments. A waiver that doesn’t substantially follow the forms is unenforceable, and nobody may require an unconditional waiver for money that hasn’t been received (§53.283).
Homeowner Contractor Subcontractors Suppliers paypay If they go unpaid: possible lien claim on your property Reserve 10% · collectlien waivers
Illustration. Payments flow from you to the contractor to subcontractors and suppliers. If someone down the line goes unpaid, Texas law lets them pursue a lien on your property — the reason for the 10% reserve and lien waivers.
Texas statutory time windows that affect an addition contract (days)
Updated sub/supplier list after a change (§53.256): 15 daysUpdated sub/supplier list after a change (§53.256)15 daysReserve kept after completion (§53.101): 30 daysReserve kept after completion (§53.101)30 daysHomestead renovation lien: credit wait: 5 daysHomestead renovation lien: credit wait5 daysHomestead renovation lien: rescission: 3 daysHomestead renovation lien: rescission3 days
+View as table
ItemValue (days)
Updated sub/supplier list after a change (§53.256)15
Reserve kept after completion (§53.101)30
Homestead renovation lien: credit wait5
Homestead renovation lien: rescission3

Source: Texas Property Code §§53.101, 53.256 (statute text; HB 2237 enrolled text); Texas Constitution Art. XVI §50(a)(5)(B)–(C) (Texas Legislative Council). Whether the constitutional conditions apply to a specific contract is a question for a lender or Texas attorney. Checked Oct. 25, 2026.

Progress paymentFinal payment ConditionalUnconditional Effective when your checkclears the bankEffective when your checkclears the bankSigner states paymentwas already receivedSigner states paymentwas already received Prop. Code §53.284 forms (b)–(e). Signer’s signature; notarization no longer required since Jan. 1, 2022.
Illustration. The four statutory lien-waiver forms: conditional waivers take effect when your payment clears; unconditional waivers state the money was already received.

Two more items to look for on an existing-home project: Property Code §41.007 requires a contract for improvements to an existing residence to carry a bold “IMPORTANT NOTICE” warning that you may lose ownership rights if you don’t meet the contract’s terms, and requires any binding-arbitration clause to be in at least 10-point bold type to be enforceable against the owner. If your contract has neither, ask why.

General information from the statutes cited, not legal advice. For how a statute applies to your contract or financing, consult a Texas attorney.

Payment schedules tied to completed work

Design approvedFoundation inspectedFraming / dry-inRough-ins inspectedFinal + walkthrough +30 days Pay for completed, checkable work — not for calendar dates
Illustration. A payment schedule that follows completed, inspectable milestones — with the reserved 10% held until 30 days after completion.

Pay for work that is complete and checkable — a passed inspection, framing you can see — not for dates on a calendar. A schedule like this keeps your payments in step with the value in place and gives each payment a clear trigger. Pair each progress payment with a conditional waiver from the contractor (and from major subcontractors and suppliers where you choose), then the unconditional version once the payment has cleared.

If you’re financing the addition, your lender may set its own draw schedule and inspections — MAV’s remodeling financing guide explains the common options.

Interactive check
Which proposal problem are you looking at?

Pick what you’re seeing in the bids you have:

Check the line-item table above first: engineering, permits, roof tie-in, exterior match, HVAC/electrical capacity and finish allowances are the usual gaps. Ask the low bidder to price the same scope in writing.
Ask for a breakdown by phase and a list of what is excluded. You can’t compare, plan change orders or tie payments to milestones against a single number.
Ask what product each allowance assumes and how overages are billed. Compare allowances side by side between bidders — a low allowance is a lower bid, not a lower project.
We found no statutory deposit cap in the Property Code sections reviewed, but a schedule tied to completed milestones protects you. Ask what the upfront payment buys — design, engineering, permit fees, ordered materials — and get that in writing.
Questions to ask before you sign an addition contract

Tick each one off as your contractor answers it.

A homeowner checklist; not legal advice.

What MAV clients say on Google5.0on Google

MAV’s verified review set does not yet include a room-addition project. These verified Google reviews mention pricing honesty, communication and transparency across MAV’s projects.

“I had a great experience with Mav building my ADU. The entire process was smooth, professional, and much easier than I expected. Their team was responsive, transparent, and kept me informed every step of the way.”

Omer Ahmed · Google review

“The team was easy to work with, communicated well throughout the project, and paid attention to the small details.”

Rico Wayne · Google review

“They took the time to understand what I wanted and offered helpful suggestions without being pushy.”

Courtney · Google review

“They were honest about pricing, communicated well, and delivered exactly what they promised.”

Brianna Pettis · Google review
Read all reviews on Google →

About MAV Design & Build

Veteran-owned
Licensed & insured Houston design-build contractor — design, permitting and construction under one team.
See it before you sign
Free 3D design so the proposal describes something you’ve already seen — Addition 3D Design.
Room additions
Bedroom, primary-suite, office and second-story additions — see Room Additions.

Frequently asked questions

Why is one contractor’s addition quote so much lower than the others?+
Most large gaps come from scope, not efficiency: one proposal may leave out engineering, permits, the roof tie-in, exterior matching, HVAC capacity work or finishes, or carry them as low allowances. Line the proposals up item by item before comparing totals — the lowest number is often the least complete one.
What does Texas law require my contractor to give me before I sign?+
For a residential construction contract, Texas Property Code §53.255 requires the original contractor to deliver a “Know your rights and responsibilities” disclosure statement before you execute the contract. §53.256 requires a written list of the subcontractors and suppliers the contractor intends to use, before construction starts, updated within 15 days of any change — unless you sign a specific written waiver.
What is the 10% I’m supposed to hold back?+
Property Code §53.101 requires the owner, during the work and for 30 days after it is completed, to reserve 10% of the contract price (or of the value of work done). Since January 1, 2022 the statute calls these “reserved funds” rather than “retainage”; the 10%/30-day substance did not change. The disclosure statement warns that if you don’t reserve it and a valid claim is timely made, you may be personally liable up to the amount you failed to reserve.
Which lien waivers should I collect?+
Texas prescribes four forms in Property Code §53.284: conditional and unconditional waivers, each for a progress payment and for final payment. A conditional waiver takes effect when the payment actually clears; an unconditional one states the money was already received, and §53.283 bars requiring an unconditional waiver unless that payment was received. Since 2022 the signature no longer has to be notarized.
Is there a legal limit on how much deposit a Texas contractor can ask for?+
We did not find a statutory deposit cap in the Texas Property Code sections reviewed for this guide (Chapter 53 and §41.007). Regardless of any cap, a schedule that pays for completed, inspectable milestones keeps your payments in line with the work in place. For a specific contract, ask a Texas attorney.
Do I need to sign the contract at a title company or wait five days?+
The Texas Constitution (Art. XVI, §50(a)(5)) sets extra conditions for a valid lien on a homestead for work to repair or renovate existing improvements — including both spouses’ written consent, a five-day wait after a written credit application, a three-day rescission right, and signing at a lender’s office, an attorney’s office or a title company. Whether those conditions apply to your particular project and financing is a question for your lender, title company or a Texas attorney.
How should change orders be handled?+
In writing, before the changed work is done: what changes, the price or credit, and the schedule effect, signed by both parties. Ask how hidden conditions found after demolition (rot, undersized framing, plumbing problems) will be documented and priced, so a surprise becomes a written change order rather than a dispute.
What should I get at the end of the project?+
Final inspection approval, unconditional final lien waivers from the contractor (and, where you ask for them, major subcontractors and suppliers), warranty terms in writing, and the drawings and product information for what was built. MAV’s final inspection and certificate-of-occupancy guide covers the inspection side.
MAV Design & Build promotional video · captions burned in · tap to play
Current MAV offer
Architectural-level design before you build

Offer shown in the video: design cost credited back.

Terms, eligibility and how long the offer runs are confirmed by MAV in writing before you sign — ask when you request your estimate. What the video shows: A 35-second MAV Design & Build promotional video on planning with architectural-level floor plans and 3D design before construction — so the proposal you compare describes a defined project.

Ask About This OfferCall (832) 532-6829

Related room-addition planning guides

Building a room over a garage or covered patio
Live loads, garage fire separation, stair space and footings. Room over a garage or patio guide →
Property taxes, appraisal & insurance
How Texas treats a new addition after it’s built. Property tax & appraisal guide →
In-law suite or second dwelling unit?
Kitchenettes, separate entrances and accessible design. In-law suite planning guide →
Approvals outside city limits
County floodplain rules, ETJ codes, Chapter 233 and HOA review. Approvals outside city limits guide →
Connecting an addition to the existing house
Foundation tie-in, roof tie-in, the wall opening and keeping moisture out. Connecting an addition to the house guide →
HVAC, electrical & plumbing for an addition
Load calculations, mini-split vs. extending ducts, panel capacity and water heater sizing. HVAC, electrical & plumbing guide →
Living at home while it’s built
Dust/noise control, utility shutoffs, lead-safe work on pre-1978 homes and the final walkthrough. Living at home guide →
Looking original and staying bright
Matching brick and roofline, ceiling height rules and safe window/French door placement. Design & daylight guide →
What a 10×10 to 20×30 addition gives you
Footprint vs usable area, the code minimum room size, and MAV’s published cost range by size. Room addition sizes guide →
Adding on in a Houston historic district
What triggers a Certificate of Appropriateness, the 9 exemptions, and the application checklist. Historic district COA guide →
Adding on in a Memorial Village
Setbacks, height and lot-coverage rules compared across all six villages, plus each one’s own permit office. Memorial Villages permits guide →

Want a proposal you can compare line by line?

Tell MAV what you want to add. We’ll walk you through the scope — drawings, engineering, permits, the connection to your house and finishes — and give you a free estimate.

Request a Free EstimateCall (832) 532-6829

Related MAV pages: Room Additions, Room additions by city, Master Suite Addition, home addition cost guide, design-build vs. general contractor, remodeling financing, home additions planning & permits and final inspection & certificate of occupancy.

Sources
  1. Texas Property Code §53.255 — disclosure statement for residential construction contracts
  2. Texas Property Code §53.256 — list of subcontractors and suppliers
  3. Texas Property Code §53.101 — funds required to be reserved (formerly “retainage”)
  4. HB 2237, 87th Legislature (enrolled) — Chapter 53 amendments effective Jan. 1, 2022
  5. Texas Property Code §53.283 — unconditional waiver requires payment
  6. Texas Property Code §53.284 — statutory lien waiver and release forms
  7. Texas Property Code §41.007 — home improvement contract notice and arbitration clause
  8. Texas Constitution Art. XVI §50(a)(5) — homestead liens for improvements (Texas Legislative Council)

The official statutes site renders statute text only in a browser app, so section text was taken from verbatim statute reproductions and checked against the enrolled HB 2237 text for the 2022 changes (terminology “retainage” → “reserved funds”; lien-waiver notarization removed). No statutory deposit cap was found in the sections reviewed; that is a limited search result, not a legal conclusion. Checked October 25, 2026. Not legal advice.

What Houston Homeowners Say⭐ 5.0  •  Google Reviews
Waseem NaqviApril 2026
★★★★★

I'm extremely satisfied with my kitchen renovation. The entire process was handled with professionalism and precision. The crew was respectful, efficient, and always made sure I was informed every step of the way. The final result — a beautiful, well-designed kitchen with top-quality finishes and excellent craftsmanship.

AviadApril 2026
★★★★★

Love their work, the kitchen turned out amazing and exceeded our expectations. Completed in much shorter time than I thought it would. Can't recommend them enough!!

Dwight HoldenMarch 2026
★★★★★

Great experience working with this company! They remodeled my kitchen and did an amazing job. The team was professional, easy to work with, and always on time. Everything went smoothly, and they paid attention to the small details.