Before buying a lot for new construction or a tear-down rebuild in the Houston area, check two things first: recorded deed restrictions (Houston has no zoning) and whether the lot needs a septic (OSSF) permit.
Before buying a lot for new construction or a tear-down rebuild in the Houston area, check two things first: recorded deed restrictions (Houston has no zoning) and whether the lot needs a septic (OSSF) permit.
Texas law sets specific deadlines and appeal rights once your HOA denies a pergola, deck or patio cover application. What Property Code Section 209.00505 requires, and what’s left to your own community’s rules.
Houston exempts retaining walls under 4 feet from a permit — but only if nothing sits above or behind them. Here is exactly how the height is measured, what a “surcharge” is, and when the exemption disappears.
Houston’s adopted energy code sets real insulation and window performance minimums for a converted garage — and the slab underneath it was built exempt from the vapor-retarder rule other rooms require. What that means for planning the thermal envelope and HVAC.
The Houston-adopted building code requires a patio within 10 feet of your foundation to slope at least 2% away from the house. Here is the code requirement, why it matters on expansive clay soil, and how to fix a yard that already pools water.
Houston usually will not assign your backyard ADU its own address unless it has its own electric meter. Here is the City’s address rule, the CenterPoint Energy process, and the real cost drivers, sourced.
New Construction · Design-Build · Houston Area New Home Construction, Built Your Way Custom homes on your own lot, spec homes built for sale, or a tear-down rebuild — MAV Design & Build handles new construction the same way it handles every project: in-house design, permitting and construction, start to finish. Book a New Construction […]
Houston calls it a Certificate of Occupancy; Harris County calls it a Certificate of Compliance. What actually closes out an ADU or garage-conversion rental-unit permit, sourced from each office’s own site.
Before a converted garage can legally become a bedroom, it has to clear two separate IRC code minimums: an egress window sized to Section R310, and a ceiling height sized to Section R305.1. What each one actually requires and the retrofit problems that trip up existing garages.
Base flood elevation, freeboard and the 50% ‘substantial improvement’ rule can change a home addition or ADU’s foundation design and cost in a Houston-area floodplain. What the rules actually say, and why additions and ADUs are affected differently than a whole new home.