Category: Permits & Regulations

Does Your AC Need to Be Bigger After a Second-Story Addition in Houston?

A second story adds real conditioned square footage, roof exposure and duct runs your existing AC was never sized for. Here’s how IRC code actually decides whether it needs to grow — not a square-foot rule of thumb.

Kitchen Remodel Permits in Bellaire, West U, Southside Place & the Memorial Villages

Bellaire, West University Place, Southside Place, and the six Memorial Villages each run their own building permit office, separate from Houston. See who issues your kitchen remodel permit, what triggers one, and who inspects, city by city.

Who Approves an ADU in Your Neighborhood? Houston-Area Permit & Deed-Restriction Guide

Whether you can build an ADU depends on who permits your address, what that code allows and what your deed restrictions allow. MAV’s approved Houston-area neighborhoods mapped to their permitting authority, with only primary-verified rules stated.

Who Approves a Home Addition Outside City Limits? County, ETJ, MUD and HOA Rules

Outside a city’s limits, approvals for a Houston-area home addition come from county floodplain rules, a city’s ETJ code, a county’s Chapter 233 rules if adopted, and your HOA’s architectural review.

Does a Second-Story Addition Need Foundation Engineering in Houston?

A second story roughly doubles the load an existing foundation carries. Texas’s small-dwelling engineer exemption doesn’t cover slab design on expansive soil — and most of Houston sits on exactly that soil class.

Secondary Electric Meter & Utility Separation for a Houston ADU

Houston usually will not assign your backyard ADU its own address unless it has its own electric meter. Here is the City’s address rule, the CenterPoint Energy process, and the real cost drivers, sourced.

Certificate of Occupancy vs. Final Inspection: ADU & Garage Conversion

Houston calls it a Certificate of Occupancy; Harris County calls it a Certificate of Compliance. What actually closes out an ADU or garage-conversion rental-unit permit, sourced from each office’s own site.

FEMA Flood Elevation & Freeboard Rules for Home Additions and ADUs in Houston

Base flood elevation, freeboard and the 50% ‘substantial improvement’ rule can change a home addition or ADU’s foundation design and cost in a Houston-area floodplain. What the rules actually say, and why additions and ADUs are affected differently than a whole new home.

Deck & Patio-Cover Footings on Houston’s Expansive Clay Soil

Houston-area clay ranks lowest on the residential code’s own soil bearing-value table. How that changes deck and patio-cover footing sizing, and what the code requires when soil tests as truly expansive.

Houston Permitting Center vs. Harris County Engineering: Which Office Handles Your Permit

Whether your addition, garage conversion or ADU permit goes through the Houston Permitting Center or Harris County Engineering depends on one thing: is the property inside Houston’s city limits or in unincorporated Harris County?