MAV Design & Build

How to Compare Kitchen Remodel Estimates & Bids in Houston

Kitchen Remodeling Houston TX
Kitchen RemodelingMAV Design & Build — Houston TX✅ Veteran-Owned  ✅ Licensed & Insured  ✅ Free EstimatesGet a Free Quote →
Kitchen Remodeling · Estimates & Contracts · Houston
Compare Kitchen Remodel Estimates Like a Pro

Two contractors can walk through the same kitchen and hand you two very different numbers — and the gap is almost never random. Here’s exactly what an itemized estimate should list, how to compare bids that use different allowances, and what Texas law actually says about your contract.

Book a Kitchen Remodel ConsultationCall (832) 532-6829
Bid A Bid B
Illustration. Two itemized estimate sheets are compared side by side, with one allowance line item highlighted in gold on each.
10% / 30 days
Owner retainage held from a residential construction contract, Texas Property Code §53.101
3 business days
Cancellation window under the FTC Cooling-Off Rule for a qualifying $25+ sale signed at the buyer’s home, 16 CFR Part 429
3 days
Rescission window the Texas Constitution requires for a signed home-improvement lien contract secured by your homestead, art. XVI §50(a)(5)

Sources: Texas Property Code §53.101; 16 CFR Part 429 (FTC Cooling-Off Rule); Texas Constitution art. XVI §50(a)(5). Checked October 25, 2026.

What should an itemized kitchen remodel estimate include?

A complete kitchen remodel estimate itemizes design, demolition and disposal, cabinets, countertops, tile, plumbing/electrical/gas work, whether appliances are included, whether permit fees are included, finishes, and cleanup — with a specific dollar allowance for anything not yet selected. If a bid is one lump-sum number with no breakdown, ask for an itemized version before comparing it to anything else.

Lump sum One number — not comparable line by line against another bid Itemized Each scope item priced on its own line
Illustration. A single lump-sum number cannot be compared line by line against another bid, while an itemized estimate prices each scope item on its own line.

What belongs on every itemized estimate

Line itemWhat a complete estimate specifies
Design & drawingsWhether a design/layout fee is a separate line or folded into the total, and what it covers (floor plan, elevations, 3D renderings).
Demolition & disposalRemoval of existing cabinets, counters, flooring and fixtures, plus haul-away/dumpster cost — confirm it is not left as “by owner.”
CabinetsCabinet line/grade and box construction if selected, or a stated dollar allowance if not yet chosen.
CountertopsMaterial category and a $/sq ft allowance if the exact slab or stone hasn’t been picked yet.
Tile & backsplashA per-square-foot or lump allowance for backsplash and any floor tile included in the scope.
Plumbing, electrical & gasWhat rough-in and fixture work is included — sink/faucet relocation, new circuits, gas line changes for a range or hood.
AppliancesWhether appliances are included at a stated allowance or excluded entirely so the owner buys them separately.
PermitsWhether permit fees are included in the total or billed separately to the owner.
Paint & finishesWalls, trim, and any ceiling work included in the scope.
CleanupFinal construction cleaning before the walkthrough.
Different scope
One bid may include work — like electrical rough-in or paint — that another leaves out entirely.
Different allowance levels
A low allowance for cabinets or stone makes a bid look cheaper until you price your actual selections against it.
Different labor & overhead
Crew size, scheduling, and how a company prices its own time all shift the number without changing the kitchen.
Different contingency
Some bids build in a buffer for hidden conditions found after demolition; others don’t, and add it later as a change order.

Allowances — comparing bids that use different numbers

An allowance is a placeholder dollar amount built into the estimate for a material or fixture you haven’t picked yet — cabinet hardware, a specific tile, a plumbing fixture, a lighting package. Two bids with identical construction scope can land on very different totals simply because they assign different allowance dollars to the same unselected items.

Interactive check
Is this missing from your estimate?

Pick what’s true about the written estimate in front of you:

Not yet comparable. Ask for an itemized version broken out by design, demo, cabinets, tops, tile, plumbing/electrical/gas, appliances, permits, finishes and cleanup before putting it side by side with another bid.
Ask for the number. An allowance without a dollar figure isn’t comparable — request a specific allowance amount for each unselected item (e.g. a stated countertop $/sq ft allowance, a stated appliance allowance).
Get it in writing. Ask the contractor to state plainly whether permit fees and appliances are included in the total or billed separately — this alone can explain a large gap between two bids.
Request both before signing. A written payment schedule tied to completed milestones and a written change-order procedure protect both sides once work is underway.
Bid-normalization checklist — confirm these before comparing two kitchen estimates

Tick each one off as your contractor answers it.

Who supplies the materials — you or the contractor?

Some owners want to buy a specific tile, fixture, or appliance themselves rather than use the contractor’s allowance. That can work, but it shifts responsibility: owner-supplied items are usually not covered by the contractor’s workmanship warranty if they fail or arrive damaged, and a late or wrong delivery on an owner-supplied item can push the schedule the same way a backordered contractor-supplied item would. Ask directly, for each major material category, whether the contractor is supplying it or you are — and get the answer in writing as part of the estimate, not assumed.

Hidden conditions & contingency, without a scary number

Once demolition opens a wall or pulls up flooring, a kitchen remodel can turn up conditions nobody could see beforehand — outdated wiring, aging plumbing, water damage, or an uneven subfloor. There’s no single, universal contingency percentage that applies to every project, and a number invented without a source isn’t useful to you. What matters is asking two direct questions before you sign: does this estimate include a contingency line for conditions found after demolition, and if something unexpected turns up, is it priced and approved as a written change order before the work happens — or added to the bill afterward?

Change orders — written, priced, approved before work continues

A change order is simply a documented change to the original contract — a different tile, an added outlet, a condition found behind a wall. On a well-run project, every change order describes the change, states the price impact as an add or a credit to the contract total, and is signed by the owner before the revised work begins. A change that shows up only as a surprise line on the final invoice is a sign the process wasn’t followed.

  1. 1
    Step 1
    The change is described in writing
    What is changing from the original scope, and why — a selection change, a hidden condition, or an owner request.
  2. 2
    Step 2
    The price impact is stated
    An add or a credit against the contract total, shown as its own number, not folded silently into a later draw.
  3. 3
    Step 3
    The owner approves it before work starts
    A signature or written confirmation on the change order itself — not a verbal okay followed by an invoice.

Payment schedule, the contract & your rights under Texas law

General information, not legal advice — for a specific contract or dispute, consult a licensed Texas attorney.

What the contract should stateWhy it matters
Scope of work tied to the estimateThe contract should reference the same itemized scope and allowances you compared, not a vaguer summary.
Total price & payment scheduleDraws tied to completed milestones rather than only to calendar dates.
Estimated start & substantial-completion datesA stated timeframe gives both sides a reference point if the schedule slips.
Written change-order procedureHow changes will be priced, documented, and approved once work is underway.
Warranty termsWhat is covered, for how long, and whether it is separate from manufacturer warranties on products.
Who pulls permitsWhether the contractor or the owner is responsible for permit applications and fees.

Texas law adds specific protections to a residential construction contract. Retainage: under Property Code §53.101, the owner must hold back 10 percent of the contract price (or of the value of completed work) during construction and for 30 days after completion. Disclosure statement: under §53.255, the original contractor must deliver a written disclosure statement to the owner before a residential construction contract is signed. See the full chapter at Texas Property Code, Chapter 53.

If the remodel is financed with a loan secured against your home: the Texas Constitution (art. XVI, §50(a)(5)) requires the work and materials to be contracted for in writing (with both spouses’ consent for a family homestead), the contract not to be signed before the fifth day after the owner’s written credit application, the contract to be signed only at the office of the third-party lender, an attorney, or a title company, and the contract to give the owner a 3-day right to rescind without penalty — with narrow exceptions for immediate health-or-safety repairs acknowledged in writing. See Texas Constitution, Article XVI. Property Code §41.007 separately requires a conspicuous, bold-type warning notice in a homestead home-improvement contract — see Property Code §41.007.

The FTC Cooling-Off Rule (16 CFR Part 429) gives a 3-business-day right to cancel a qualifying sale of $25 or more when it is signed at the buyer’s home — it generally does not apply to a contract signed at a contractor’s office or other permanent place of business. See 16 CFR Part 429.

Texas has no statewide general-contractor license — see the licensing programs TDLR administers, which does not include a general-contractor credential. Specific trades are licensed separately: electricians through TDLR and plumbers through the Texas State Board of Plumbing Examiners.

Key Texas deadlines & holding periods for a kitchen remodel contract
FTC Cooling-Off Rule cancellation window (qualifying $25+ sale signed at home): 3 daysFTC Cooling-Off Rule cancellation window (qualifying $25+ sale signed at home)3 daysHomestead lien contract rescission window (Tex. Const. art. XVI §50(a)(5)): 3 daysHomestead lien contract rescission window (Tex. Const. art. XVI §50(a)(5))3 daysStatutory retainage held after completion (Property Code §53.101): 30 daysStatutory retainage held after completion (Property Code §53.101)30 days
+View as table
ItemValue (days)
FTC Cooling-Off Rule cancellation window (qualifying $25+ sale signed at home)3
Homestead lien contract rescission window (Tex. Const. art. XVI §50(a)(5))3
Statutory retainage held after completion (Property Code §53.101)30

Source: Texas Property Code §53.101; Texas Constitution art. XVI §50(a)(5); 16 CFR Part 429. Checked October 25, 2026.

  1. 1
    Good practice
    Itemized scope & stated allowances
    The same breakdown used to compare bids, not a vaguer summary of the work.
  2. 2
    Good practice
    Payment schedule tied to milestones
    Draws released as work is completed, with a written change-order procedure for anything that changes along the way.
  3. 3
    Good practice
    Statutory protections honored
    Retainage held per §53.101, a disclosure statement delivered per §53.255, and homestead-lien formalities followed when a home-secured loan is financing the work.
  1. 1
    Ask
    Is the estimate itemized by scope?
    Request a written breakdown rather than a single lump-sum number, with a dollar allowance for anything not yet selected.
  2. 2
    Ask
    How are change orders documented?
    Ask how a change’s scope and price get documented and approved before the revised work begins.
  3. 3
    Ask
    What does closeout look like?
    Ask what the punch list and final walkthrough process looks like at project completion.

Ask MAV to walk you through its estimate line by line before you sign. Related reading: MAV’s guide to questions to ask a remodeling contractor and how to choose a remodeling contractor in Houston.

Delays — what causes them, and what to ask

Kitchen remodels commonly slip for a handful of recurring reasons: backordered cabinets, countertops, or appliances; a change order that expands the original scope; permit or inspection scheduling; a hidden condition discovered once demolition starts; and, for any work tied to exterior access, weather. If a contractor promises an unusually fast timeline, ask what’s included in that number — does it assume materials already in stock, no change orders, and no inspection delays? A realistic answer to that question tells you more than the number itself.

Punch list, final walkthrough & closeout documents

  1. 1
    Step 1
    Punch list
    A written list of remaining small items — touch-up paint, hardware adjustments, a caulk line — walked and agreed with the contractor before final payment.
  2. 2
    Step 2
    Final walkthrough
    Confirm every punch-list item is resolved, test fixtures, appliances and outlets, and check that finishes match what was specified.
  3. 3
    Step 3
    Closeout documents
    Collect product/appliance warranties and manuals, the final invoice marked paid, and, if permits were pulled, the final inspection record.

If a contractor abandons the job

If work stops before the contract is finished, document what was actually completed against the signed scope and what has already been paid, and request a written accounting from the contractor. Because Texas has no statewide general-contractor licensing board, there is no state GC license to file a complaint against the way there is for a licensed electrician (TDLR) or plumber (Texas State Board of Plumbing Examiners) — which makes the retainage held under Property Code §53.101 and the mechanic’s-lien framework in Property Code Chapter 53 especially relevant to understand. Consult a licensed Texas attorney about your specific situation; this page is general information, not legal advice.

MAV kitchen project — a full remodel from layout to finishes

Completed MAV kitchen project; location not published.

Galley kitchen with white upper cabinets and a two-tone island
A galley-style kitchen with white upper cabinets, a dark two-tone island with a built-in double oven, and a stainless refrigerator at the end of the run.
White kitchen cabinets with gray subway tile backsplash and dishwasher
White cabinetry lines the room with a gray subway-tile backsplash, an integrated dishwasher, and a window over the sink.
Range hood with pendant light over a kitchen island
A linear pendant-light fixture hangs over the island beside a range hood and gray subway-tile backsplash, with the backyard visible beyond.

MAV kitchen project — white shaker cabinetry, open-concept layout

Completed MAV kitchen project; location not published.

White shaker kitchen cabinets with stainless range and hood
White shaker cabinetry surrounds a stainless range and hood, with a light stone-look countertop along the run.
Gooseneck faucet over a stainless undermount sink
A gooseneck faucet arches over a stainless undermount sink, with the range and microwave visible behind it.
Open-concept kitchen island with bar seating and pendant lighting
An open-concept kitchen view showing the island with bar seating, pendant lighting, and a stainless refrigerator along the back wall.
What MAV kitchen-remodel clients say on Google5.0on Google

Verified Google reviews from MAV Design & Build kitchen remodeling clients.

“Great experience working with this company! They remodeled my kitchen and did an amazing job. The team was professional, easy to work with, and always on time.”

Dwight Holden · Google review

“Really nice kitchen upgrade. The work was done on time and looks amazing.”

Syed Naqvi · Google review

“We had a great experience with our kitchen renovation. The crew was easy to work with, very responsive, and kept everything clean and organized throughout the project.”

Michael Johnson · Google review
Read all reviews on Google →

About MAV Design & Build

Veteran-owned
Founded in 2018; office at 7055 Old Katy Rd, Suite 506, Houston, TX 77024.
Houston-area kitchen remodels
Full kitchen remodeling — cabinets, countertops, layout redesign, open-concept and luxury kitchens, 3D design — across MAV’s Houston-area service cities.

Frequently asked questions

What should an itemized kitchen remodeling estimate include?+
A complete estimate breaks the job into priced line items instead of one lump sum: design, demolition and disposal, cabinets, countertops, tile and backsplash, plumbing/electrical/gas work, whether appliances are included, whether permit fees are included, paint and finishes, and cleanup/haul-away — with a stated dollar allowance for anything not yet selected.
Does a kitchen remodeling estimate include appliances?+
Not always, and estimates vary on this — some include appliances at a stated allowance, others exclude them entirely so the owner buys them separately. Confirm which approach each bid is using before comparing totals; an estimate that excludes appliances will look cheaper than one that includes them even if the underlying construction scope is identical.
Does a kitchen remodeling estimate include permits?+
Some estimates include permit fees in the total price; others list them as a separate owner cost or a pass-through line item. Ask each contractor directly which approach their estimate uses, and see MAV’s guide to which Houston remodeling projects need a permit for how permitting generally works.
Why are my kitchen remodeling quotes so different?+
The construction scope, the allowance levels assigned to materials not yet selected, whether appliances and permits are included, how much contingency is built in for hidden conditions, and the crew/labor assumptions behind the price can all differ between bids — even when every contractor walked the same kitchen. Two numbers can only be compared fairly once the scope is itemized the same way.
How do I compare bids with different allowances?+
List every allowance in each bid next to its dollar amount — cabinets, countertops, tile, plumbing fixtures, lighting, appliances — and recalculate each bid using the same allowance figures so the comparison isolates labor and overhead rather than mixing in different material budgets.
What warranty should I receive?+
Ask each contractor, in writing, what their warranty covers, how long it lasts, and whether it covers labor, materials, or both — manufacturer warranties on products like appliances and plumbing fixtures are separate from a contractor’s workmanship warranty, and a contract should state both clearly rather than leaving the warranty undefined.
How are change orders priced and approved?+
A change order should describe the specific change in writing, state the price impact as an add or a credit to the contract total, and be signed by the owner before the added or revised work begins — not invoiced after the fact as a surprise on the final bill.
What should I do if my contractor leaves the job unfinished?+
Document the work actually completed against the signed contract and what has been paid, request a written accounting in writing, and consult an attorney about your options — including any retainage withheld under Texas Property Code §53.101 and mechanic’s-lien protections under Property Code Chapter 53. This is general information, not legal advice.

Ready to get an itemized kitchen estimate?

MAV provides a written, itemized estimate for every kitchen remodel — and documents every change order before the work changes.

Book a Kitchen Remodel ConsultationCall (832) 532-6829

What a finished scope looks like

Completed kitchens that show how line items come together. Locations are not published.

Dual-island kitchen with white upper cabinets and wood-tone lower cabinets
A dual-island kitchen in progress shows white upper cabinets, light wood lower cabinets, and a stainless refrigerator.
White cabinet kitchen with teal herringbone backsplash and island
A wide view of the white shaker kitchen with a marble-look island, teal herringbone tile backsplash, and stainless steel appliances.
White kitchen island with wood barstools and honeycomb backsplash
A wide view of the kitchen’s granite-topped island with wood barstools, white shaker cabinetry, stainless refrigerator, and honeycomb marble backsplash.
White kitchen with gray island and blue penny tile backsplash
A wide view of the white shaker kitchen with a gray-cabinet island, marble-look countertops, and a blue penny tile backsplash behind the range.
Kitchen sink area with waterfall island and window daylight
A kitchen sink area with a waterfall-edge island and natural daylight from a nearby window.
Walkthrough clip from a completed MAV kitchen. Walkthrough of a finished white kitchen, panning from the sink window to the dining area and through the appliance wall. (Silent clip, 19 s.)

From MAV’s video team

MAV promotional video: Kitchen Remodeling Special. A dated kitchen with brown cabinets becomes a bright white kitchen with a professional range and hood. Includes illustrative and concept scenes alongside project footage; has sound and captions. Offer shown in the video: a free 3D design and up to $5,000 credit toward a MAV kitchen remodel. Ask MAV for current terms.
Read the transcript

Houston, Texas homeowners. If your kitchen feels outdated, your whole home feels outdated. With MAV Design and Build, we create luxury kitchens designed for real living, entertaining, and everyday function. Get a free 3D design with custom cabinetry planning, optimized workflow, premium finishes, and smart storage solutions. Everything is planned before construction begins. Plus, receive up to $5,000 credit toward your kitchen remodel. Click below to start your kitchen consultation today.

Related kitchen guides

Remodeling a Kitchen in an Older Houston Home
Lead, asbestos, wiring and plumbing to check before demolition.
Read the guide →
Living at Home During a Kitchen Remodel
Temporary kitchen, dust control and safety.
Read the guide →
Kitchen Remodel Permits in Bellaire, West U & the Memorial Villages
Who issues kitchen permits in nine small cities.
Read the guide →

Browse every guide in MAV’s kitchen remodeling guide library.

For current MAV pricing guidance, see kitchen remodel cost in Houston and kitchen remodeling cost by category. For financing options, see remodeling financing in Houston, and for a full scope checklist see what’s included in a kitchen remodel. For how to plan the layout itself before comparing bids, see MAV’s kitchen layout types guide.

For MAV’s full kitchen service, see kitchen remodeling in Houston. Homeowners in Sienna can see MAV’s kitchen remodeling services in Sienna.

What Houston Homeowners Say⭐ 5.0  •  Google Reviews
Waseem NaqviApril 2026
★★★★★

I'm extremely satisfied with my kitchen renovation. The entire process was handled with professionalism and precision. The crew was respectful, efficient, and always made sure I was informed every step of the way. The final result — a beautiful, well-designed kitchen with top-quality finishes and excellent craftsmanship.

AviadApril 2026
★★★★★

Love their work, the kitchen turned out amazing and exceeded our expectations. Completed in much shorter time than I thought it would. Can't recommend them enough!!

Dwight HoldenMarch 2026
★★★★★

Great experience working with this company! They remodeled my kitchen and did an amazing job. The team was professional, easy to work with, and always on time. Everything went smoothly, and they paid attention to the small details.