A temporary kitchen, dust control, and a plan for kids and pets — most Houston homeowners stay in the house through a kitchen remodel, but it takes real planning. Here’s what to set up, what to ask your contractor, and how long to actually plan for.
Book a Kitchen Remodel ConsultationCall (832) 532-6829Sources: MAV’s own kitchen remodel cost guide and USDA Food Safety and Inspection Service (checked Oct 25, 2026).
Can I live at home during a kitchen remodel?
In most cases, yes. Many homeowners stay in the house through a kitchen remodel by setting up a temporary kitchen elsewhere and planning around utility shutoffs and active work zones. MAV’s own published typical range for a full kitchen remodel is 6 to 12 weeks start to finish — plan a temporary kitchen for that range, not just a week or two.
Scope drives the timeline more than anything else — a cosmetic refresh sits toward the shorter end, and a full gut-and-reconfigure with a layout change sits toward the longer end. See MAV’s kitchen remodel timeline page for what moves a specific project within that range.
Setting up a temporary kitchen
A workable temporary kitchen is less about having every appliance and more about covering the basics safely: cold storage, a way to heat food, and a clean prep surface, set up away from the work zone.
Tick each one off as your contractor answers it.
+View as table
| Item | Value (hrs) |
|---|---|
| Refrigerator (door kept closed) | 4 |
| Freezer, half-full (door kept closed) | 24 |
| Freezer, full (door kept closed) | 48 |
Source: USDA Food Safety and Inspection Service, Refrigeration & Food Safety, and FoodSafety.gov, Food Safety in a Disaster or Emergency (checked Oct 25, 2026). Applies to any power interruption, not specific to a remodel.
An illustrative week-by-week plan
MAV’s own published typical range for a full kitchen remodel is 6–12 weeks. The outline below is illustrative only — not a guaranteed schedule for any specific project. See the timeline page for what actually moves a project within that range.
- 1IllustrativeDemo & rough-in beginsOld cabinets, counters, and flooring typically come out first, followed by any plumbing or electrical rough-in changes. This is usually the loudest, dustiest stretch — lean hardest on the temporary kitchen here.
- 1IllustrativeWalls, cabinets, and finishesDrywall, paint, and new cabinetry typically go in during this stretch. Utility shutoffs (water, gas) are more likely around plumbing and appliance connection points.
- 1IllustrativeCountertops, backsplash, appliances & punch listFinal finishes and appliance hookups typically happen toward the end, followed by a punch-list walkthrough before the kitchen is handed back.
Dust control : what to ask your contractor
How thoroughly dust is contained varies by contractor. Rather than assume a specific method, ask directly — and if your home was built before 1978, there’s a federal rule that sets the floor for how renovation dust is handled.
EPA’s Lead Renovation, Repair and Painting (RRP) Rule states that “firms performing renovation, repair and painting projects that disturb lead-based paint in homes, child care facilities, and kindergartens built before 1978 must be EPA- or state-certified… and must use certified renovators who follow specific work practices to prevent lead contamination” (EPA, Lead RRP Program Rules, checked Oct 25, 2026).
EPA’s own description of the required work practices includes “work-area containment to prevent dust and debris from leaving the work area,” a “prohibition of certain work practices like open-flame burning and the use of power tools without High Efficiency Particulate Air (HEPA) exhaust control,” and “thorough clean up followed by a verification procedure to minimize exposure to lead-based paint hazards” (EPA, RRP Program: Work Practices, checked Oct 25, 2026).
- How will the work area be contained to keep dust and debris from leaving it?
- Will HVAC registers in or near the work zone be covered during work?
- Do you use negative-air or HEPA filtration equipment, and on which tasks?
- Is my home built before 1978, and if so, are lead-safe certified work practices part of the plan?
- What’s the cleanup and verification routine before the area is reopened?
Protecting children and pets
The simplest safeguard is physical separation: a barrier kids and pets can’t get past on their own, kept in place for the full length of the project, not just during active work hours.
If the home was built before 1978, lead dust is a specific concern: the CDC notes that “home repairs and renovations, such as sanding or scraping paint in homes built before 1978, can release lead dust,” and recommends homeowners “use only approved methods for removing lead hazards from your home and use contractors certified by the Environmental Protection Agency” (CDC, How to Prevent Lead Poisoning in Children, checked Oct 25, 2026). EPA’s own guidance adds: “keep residents out of the work area during renovation or repair work that disturbs painted surfaces in older homes or buildings until the work is finished and the area has been cleaned” (EPA, Actions to Reduce Potential Lead Exposure, checked Oct 25, 2026) — guidance that applies with particular weight to children and anyone who is pregnant.
Furniture, utility shutoffs , and phased remodels
A few more practical pieces round out the planning:
Completed MAV kitchen project; location not published.



Completed MAV kitchen project; location not published.



Verified Google reviews from MAV Design & Build kitchen remodeling clients.
“We had a great experience with our kitchen renovation. The crew was easy to work with, very responsive, and kept everything clean and organized throughout the project.”
“Love their work, the kitchen turned out amazing and exceeded our expectations and BTW it was completed in much shorter amount of time than I thought it would. Can’t recommend them enough!!”
“Great experience working with this company! They remodeled my kitchen and did an amazing job. The team was professional, easy to work with, and always on time.”
About MAV Design & Build
Frequently asked questions
Can I live at home during a kitchen remodel?+
How long will I be without a working kitchen?+
How do I set up a temporary kitchen?+
How do contractors control dust?+
How do I protect children and pets during construction?+
Do I need to move my furniture?+
Planning a kitchen remodel?
A kitchen remodel means weeks without a full kitchen. Plan the timeline and the temporary setup before work begins.
Book a Kitchen Remodel ConsultationCall (832) 532-6829The kitchen at the finish line
What the house gets back after the work wraps up. Locations are not published.





From MAV’s video team
Read the transcript
The house is quiet. The mission is simple. Find the snacks without waking anyone. One squeaky door, three mystery cabinets, a drawer that fights back. Maybe the real mission is planning a kitchen that works. Storage you can find, a layout you can make, details that make everyday life easier. MAV Design and Build for the kitchen and the midnight missions.
Related kitchen guides
Read the guide →
Read the guide →
Read the guide →
Browse every guide in MAV’s kitchen remodeling guide library.
For the step-by-step process, see MAV’s Houston kitchen remodel process, the kitchen remodel timeline, and MAV’s own kitchen remodel cost guide. For the full service overview, see kitchen remodeling, or browse the full kitchen remodeling guide library. Homeowners in Hedwig Village can see MAV’s kitchen remodeling services in Hedwig Village.
- MAV Design & Build — Kitchen Remodel Cost Guide (published typical duration range, 6–12 weeks)
- MAV Design & Build — How Long Does a Kitchen Remodel Take in Houston, TX
- USDA Food Safety and Inspection Service — Refrigeration & Food Safety
- FoodSafety.gov — Food Safety in a Disaster or Emergency
- EPA — Lead Renovation, Repair and Painting (RRP) Program Rules
- EPA — Renovation, Repair and Painting Program: Work Practices
- EPA — Actions to Reduce Potential Lead Exposure
- CDC — How to Prevent Lead Poisoning in Children
Sources checked October 25, 2026.
I'm extremely satisfied with my kitchen renovation. The entire process was handled with professionalism and precision. The crew was respectful, efficient, and always made sure I was informed every step of the way. The final result — a beautiful, well-designed kitchen with top-quality finishes and excellent craftsmanship.
Love their work, the kitchen turned out amazing and exceeded our expectations. Completed in much shorter time than I thought it would. Can't recommend them enough!!
Great experience working with this company! They remodeled my kitchen and did an amazing job. The team was professional, easy to work with, and always on time. Everything went smoothly, and they paid attention to the small details.