Not a cost table and not an ordinance list — this guide walks through the decisions and the build process: choosing attached, detached, or a garage conversion, what actually happens between consultation and move-in, and what to ask before you sign a contractor.
Book an ADU ConsultationCall (832) 532-6829
Sources: Houston Permitting Center, Residential Addition Permit and Residential Remodel Permit (as cited in MAV’s own published Garage Conversion to ADU guide; captured via Wayback Machine, direct automated access returns HTTP 403). Checked Sept. 24, 2026.
What actually happens between deciding on an ADU and moving in?
At a high level: a free consultation and site evaluation, a design phase that settles the attached/detached/garage-conversion question, a permitting step, then construction and handover. The right first decision is which structure you are actually building on — that changes the foundation work, the utility runs, and the realistic timeline more than any other single choice.
Pick the option that best describes your situation:
General guidance based on MAV’s own published pages above — not a site-specific determination for your address.
What changes with each ADU path
MAV’s own published process steps for each path — not a cost comparison (see the cost guide linked below for that).
- 1MAV’s published processStructural evaluation & integration planningFollowed by custom layout and home design, then “foundation extension and reinforcement” rather than a new stand-alone foundation. Source: MAV Attached ADU.
- 2What’s differentNeeds its own exterior entranceTo function as a legally independent living unit, MAV’s own page states it typically needs an entrance separate from the main house’s front door.
- 1MAV’s published processSite evaluation & zoning compliance assessmentFollowed by custom layout, then “foundation and structural engineering planning” for an all-new, independent foundation. Source: MAV Detached ADU.
- 2What’s differentNo shared walls, own utility hookupsThe most private layout option, and setback rules (distance from side, rear and front property lines) apply — see the regulations guide for the numbers.
- 1MAV’s published processGarage assessment & conversion feasibilityFollowed by structural modifications, layout redesign, utility installation, insulation upgrades, then kitchen/bathroom installation, HVAC, flooring and finishes. Source: MAV Garage ADU.
- 2What’s differentReuses the existing structureWalls, roof and (often) foundation already exist — the trade-off is losing that covered parking space. See MAV’s Garage Conversion to ADU guide for the full structural breakdown.
The build process, start to finish
MAV’s own site describes the sequence this way; permit-review days are the Houston Permitting Center’s own posted figures.
- 1Step 1Free in-home consultation & site evaluationCovers your lot, your goal for the unit, and which of the three paths above realistically fits — plus a deed-restriction check before design starts.
- 2Step 23D design previewMAV previews the ADU in 3D before construction begins, so layout, finishes and how it sits on the lot can be reviewed and adjusted on screen first. See MAV’s 3D design service.
- 3Step 3Permit approvalHouston’s Permitting Center posts 10 business days of plan review for a Residential Addition Permit, or 1–15 business days for a Residential Remodel Permit if you’re converting existing space. Building, Electrical, Plumbing and Mechanical permits are typically all needed.
- 4Step 4ConstructionFoundation or structural work first, then framing, mechanical/electrical/plumbing rough-in, insulation, drywall, and finishes — in that order regardless of which of the three paths you chose.
- 5Step 5Final deliveryGet a written punch list and your warranty documentation at handover. Ask specifically what is covered and for how long before you consider the project done.
Design considerations once you’ve picked a path
A handful of practical choices apply across attached, detached and garage-conversion ADUs alike, regardless of which path above fits your lot.
+View as table
| Item | Value (business days) |
|---|---|
| Residential Addition Permit (ground-up build) | 10 |
| Residential Remodel Permit (conversion), up to | 15 |
Source: Houston Permitting Center, Residential Addition Permit and Residential Remodel Permit, as cited in MAV’s own published Garage Conversion to ADU guide (captured via Wayback Machine; direct automated access returns HTTP 403). Checked Sept. 24, 2026.
Choosing an ADU contractor in Houston
A per-square-foot number means little if the scope behind it is vague. Before you sign anything, get a fixed-price, written contract and ask every item on the list below.
Tick each one off as your contractor answers it.
What a completed Houston ADU looks like





Omer Ahmed and Sam Nogroski’s reviews are about their ADU projects with MAV; the others are verified Google reviews across our services.
“I had a great experience with Mav building my ADU. The entire process was smooth, professional, and much easier than I expected. Their team was responsive, transparent, and kept me informed every step of the way.”
“Just completed my ADU with MAV great experience from start to finish highly recommend working with shon very professional”
“MAV Design & Build did an excellent job with our remodeling project. The team was professional, responsive, and paid close attention to the details.”
“Really happy with the work from MAV Design & Build. They helped bring our ideas to life and made the whole process much easier than expected.”
About MAV Design & Build
Frequently asked questions
What’s the very first step in building an ADU in Houston?+
How do I decide between an attached ADU, a detached ADU, and converting a garage?+
What questions should I ask an ADU contractor before signing a contract?+
Does MAV Design & Build handle ADU design, permitting, and construction all together?+
How long does permitting take once my ADU design is finalized?+
What happens after construction is finished?+
Thinking about an ADU on your property?
Talk through attached vs. detached vs. garage conversion, a realistic sequence, and what to ask before you sign.
Book an ADU ConsultationCall (832) 532-6829MAV’s ADU construction services cover the full design-build process, with dedicated pages for a detached ADU, an attached ADU, a garage ADU, and ADU conversion generally, plus garage conversion services and 3D home design. For Houston’s specific ADU rules under Chapter 42, see MAV’s Houston ADU Regulations guide. For the full cost breakdown by ADU type, see MAV’s ADU Construction Cost guide. For a garage-specific deep dive on floor systems, parking and floodplain rules, see MAV’s Garage Conversion to ADU guide.
- Houston Permitting Center: Residential Addition Permit (HPWCODE1134)
- Houston Permitting Center: Residential Remodel Permit (HPWCODE1135)
- MAV Design & Build: ADU Construction (hub page)
- MAV Design & Build: Detached ADU
- MAV Design & Build: Attached ADU
- MAV Design & Build: Garage ADU
- MAV Design & Build: Houston ADU Regulations (2026 guide)
- MAV Design & Build: ADU Construction Cost in Houston TX (2026 guide)
- MAV Design & Build: Garage Conversion to ADU in Houston (guide)
All facts above were checked against these sources on September 27, 2026. The two Houston Permitting Center permit-day figures are reused from MAV’s own already-published guides, which captured those pages via the Wayback Machine on September 24, 2026 (the live pages return HTTP 403 to automated fetches). Where a fact could not be confirmed on a primary source, it was left out of this article rather than estimated.