
Every photo in this article is from a real, completed MAV ADU build — two stories, not one. We walk through why a homeowner chooses to build up instead of out, the extra code requirements a second floor actually triggers, and what it looks like finished.
Book an ADU ConsultationCall (832) 532-6829
Sources: Houston Code of Ordinances, Chapter 42, Sec. 42-1 (as cited in MAV’s own Houston ADU Regulations guide); International Residential Code, Sections R311.7 and R312, as enforced by the City of Houston. Checked Oct. 16, 2026.
Why build up instead of out?
Chapter 42 caps how big a detached secondary dwelling unit can be — not how tall. On a lot where the footprint is already maxed out, or where a homeowner wants a real second bedroom and a full living area without crowding the backyard, adding a second floor is the way to get more livable square footage inside that same size cap.
Pick the option closest to your situation:
General guidance based on MAV’s own published pages and Houston’s own ordinance/code text — not a site-specific determination for your address.
What a second floor actually adds
The International Residential Code sets specific minimums the moment a build has stairs — figures below are quoted directly from the code, not estimated.
+View as table
| Item | Value (in) |
|---|---|
| Maximum riser height (R311.7.5.1) | 7.75 |
| Minimum tread depth (R311.7.5.2) | 10 |
| Minimum guard height on landings (R312.1.2) | 36 |
| Minimum stair headroom (R311.7.2) | 80 |
Source: Source: International Residential Code, Sections R311.7 (Stairways) and R312 (Guards), as enforced by the City of Houston. ICC Digital Codes, IRC Chapter 3. Checked Oct. 16, 2026.
None of this applies to a single-story build — which is exactly why a second floor is more than “the same ADU, just taller.” The stair itself has to be engineered, placed, and inspected against these numbers, and the floor framing and load path down to the foundation need a structural evaluation before layout is finalized.
Where the stair actually goes
In the project photographed throughout this article, the staircase lands directly at the kitchen island and dining table on the ground floor — placed against the house’s structure rather than cutting through the middle of either floor’s usable space. That’s a deliberate layout choice, not an accident: a stair placed badly can eat into the exact square footage a two-story build was supposed to gain back.



Upstairs: a real primary suite, not a loft
The floor plan upstairs in this build carries a full bedroom, an en-suite bathroom with a curbless shower, a walk-in closet, and in-unit laundry — the kind of program that a single compressed studio footprint usually cannot fit alongside a living area and kitchen downstairs.



The build process, with a second floor added
The same sequence as any MAV ADU build, with the structural and stair-code steps a second floor specifically requires called out.
- 1Step 1Free in-home consultation & site evaluationCovers your lot, the deed-restriction check, and — specific to a two-story build — whether the lot and foundation realistically support the added structural load.
- 2Step 2Structural evaluation for the second floorA structural engineer sizes the floor framing, the stair, and the load path down to the foundation before layout is finalized — not an afterthought once the design is already set.
- 3Step 33D design previewMAV previews the ADU in 3D before construction begins, including stair placement, so the layout can be reviewed on screen first. See MAV’s 3D design service.
- 4Step 4Permit approvalHouston’s Permitting Center posts 10 business days of plan review for a Residential Addition Permit. Building, Electrical, Plumbing and Mechanical permits are typically all needed, same as a single-story build.
- 5Step 5ConstructionFoundation first, then framing for both floors and the stair, mechanical/electrical/plumbing rough-in (now run vertically between floors), insulation, drywall, and finishes.
- 6Step 6Final inspection & deliveryThe stair and guards get inspected against the IRC figures above as part of final sign-off, alongside the standard punch list and warranty documentation at handover.
Before you commit to going two stories
Tick each one off as your contractor answers it.
Omer Ahmed and Sam Nogroski’s reviews are about their ADU projects with MAV; Cod Applegate’s is a verified Google review across MAV’s services.
“I had a great experience with Mav building my ADU. The entire process was smooth, professional, and much easier than I expected. Their team was responsive, transparent, and kept me informed every step of the way.”
“Just completed my ADU with MAV great experience from start to finish highly recommend working with shon very professional”
“MAV Design & Build did an excellent job with our remodeling project. The team was professional, responsive, and paid close attention to the details.”
About MAV Design & Build
Frequently asked questions
Why build a two-story ADU instead of a single-story one?+
Does a two-story ADU cost more than a single-story one?+
What stair code applies to the second floor of an ADU in Houston?+
Is a two-story ADU allowed on any lot, or does height matter?+
Can I convert an existing two-story garage into an ADU instead of building new?+
What does a two-story ADU actually gain over a one-story build on the same footprint?+
Do I need a structural engineer for a two-story ADU?+
Where does the staircase usually go in a two-story ADU?+
What questions should I ask a contractor before building a two-story ADU specifically?+
Does MAV Design & Build build two-story ADUs?+
Picturing a two-story ADU on your lot?
Talk through whether building up makes sense for your lot, what a structural evaluation covers, and a realistic sequence from consultation to move-in.
Book an ADU ConsultationCall (832) 532-6829MAV’s ADU construction services cover the full design-build process, with dedicated pages for a detached ADU, an attached ADU, and a garage ADU. For the full decision between attached, detached, and garage-conversion paths, see MAV’s ADU Construction guide. For Houston’s specific ADU rules under Chapter 42, see MAV’s Houston ADU Regulations guide. For cost ranges MAV has published, see the ADU Construction Cost guide. For a garage-specific deep dive, see the Garage Conversion to ADU guide.
- City of Houston Planning & Development: Livable Places User Guide, §42-1 (secondary dwelling unit size cap: 1,500 sq ft, Livable Places amendments approved Sept. 27, 2023)
- Houston Code of Ordinances, Chapter 42, Sec. 42-1 (secondary dwelling unit size cap)
- International Residential Code, Chapter 3, Section R311.7 (Stairways) and R312 (Guards)
- Houston Permitting Center: Residential Addition Permit (HPWCODE1134)
- MAV Design & Build: ADU Construction (hub page)
- MAV Design & Build: Garage ADU
- MAV Design & Build: Houston ADU Regulations (2026 guide)
- MAV Design & Build: ADU Construction Cost in Houston TX (2026 guide)
The IRC stair and guard figures above were independently verified via live search on October 16, 2026, not reused from an existing MAV page. The Chapter 42 size cap (1,500 sq ft) is verified directly against the City of Houston’s own Livable Places User Guide §42-1 (Council amendments approved Sept. 27, 2023) — not the older 900 sq ft figure that predates that 2023 amendment. The permit-review figures are reused from MAV’s own already-published, already-sourced guides. No dedicated “two-story ADU” page exists on mav-designandbuild.com as of this writing — no claim above is attributed to one.
I'm extremely satisfied with my kitchen renovation. The entire process was handled with professionalism and precision. The crew was respectful, efficient, and always made sure I was informed every step of the way. The final result — a beautiful, well-designed kitchen with top-quality finishes and excellent craftsmanship.
Love their work, the kitchen turned out amazing and exceeded our expectations. Completed in much shorter time than I thought it would. Can't recommend them enough!!
Great experience working with this company! They remodeled my kitchen and did an amazing job. The team was professional, easy to work with, and always on time. Everything went smoothly, and they paid attention to the small details.
