What is an Accessory Dwelling Unit?
An ADU is a secondary, self-contained residential unit on the same property as a primary home, with its own entrance, kitchen or kitchenette, bathroom and living space. The four types MAV builds in the Houston area:
How long does permitting actually take?
Every ADU type needs the same permit review before construction can start — the difference is which permit applies to your project.
+View as table
| Item | Value (business days) |
|---|---|
| Residential Addition Permit (ground-up build) | 10 |
| Residential Remodel Permit (conversion), up to | 15 |
Source: Houston Permitting Center, Residential Addition Permit and Residential Remodel Permit, as cited in MAV’s own published Garage Conversion to ADU guide (captured via Wayback Machine; direct automated access returns HTTP 403). Checked Sept. 24, 2026.
Which guide do you actually need right now?
Pick the question closest to yours — each option links straight to MAV’s dedicated guide on that exact topic.
What are you trying to figure out first?
What about rental income?
Asking rent depends on the unit’s size, finishes, and neighborhood, and a realistic payback period depends on your actual build cost — there is no single number that applies to every ADU. MAV’s own cash-flow calculator works through this using HUD’s Fair Market Rent as a public reference point rather than a guess.
Before you sign an ADU contractor
A per-square-foot number means little if the scope behind it is vague. MAV’s ADU Estimate & Contract Review Checklist covers this in full — the short version:
Tick each one off as your contractor answers it.
What a completed Houston ADU looks like





Omer Ahmed and Sam Nogroski’s reviews are about their ADU projects with MAV; the others are verified Google reviews across our services.
“I had a great experience with Mav building my ADU. The entire process was smooth, professional, and much easier than I expected. Their team was responsive, transparent, and kept me informed every step of the way.”
“Just completed my ADU with MAV great experience from start to finish highly recommend working with shon very professional”
“I had a great experience working with this company. From start to finish, the team was professional, reliable, and easy to communicate with.”
“They were easy to communicate with, showed up on time, and made sure everything was done properly.”
About MAV Design & Build
Frequently asked questions
I don’t know anything about ADUs yet — where do I start?+
Does Houston require a zoning permit for an ADU?+
How much will my specific ADU cost?+
Can you tell me what rent I’ll be able to charge for an ADU?+
What is the very first step before I design anything?+
Not sure which ADU is right for your lot?
Talk it through in a free in-home consultation — type, realistic sequence, and what it will actually cost for your property.
Book a Free ADU ConsultationCall (832) 532-6829MAV’s ADU construction services cover the full design-build process, with dedicated pages for a detached ADU, an attached ADU, and a garage ADU, plus 3D home design previews before construction begins. For the full cost breakdown, see MAV’s ADU Construction Cost guide; for Houston’s specific Chapter 42 rules, see the Houston ADU Regulations guide; for the step-by-step build process, see the ADU Construction Guide.
- Houston Permitting Center: Residential Addition Permit (HPWCODE1134)
- Houston Permitting Center: Residential Remodel Permit (HPWCODE1135)
- MAV Design & Build: ADU Construction (hub page)
- MAV Design & Build: ADU Construction Guide (process)
- MAV Design & Build: ADU Construction Cost in Houston TX (2026 guide)
- MAV Design & Build: Houston ADU Regulations (2026 guide)
- MAV Design & Build: Garage Conversion to ADU in Houston (guide, incl. HUD FY2026 FMR chart)
- MAV Design & Build: Two-Story ADU Construction in Houston
- MAV Design & Build: Secondary Electric Meter / Utility Separation for ADUs
- MAV Design & Build: FEMA Flood Elevation & Freeboard for Additions/ADUs
- MAV Design & Build: Certificate of Occupancy & Final Inspection (ADU/garage conversion)
- MAV Design & Build: ADU Permits by Neighborhood (Houston area)
- MAV Design & Build: ADU Floor Plans & Layouts (Houston area)
- MAV Design & Build: ADU for Aging Parents (accessible design)
- MAV Design & Build: ADU Financing Options in Texas
- MAV Design & Build: ADU Rental Income & Cash-Flow Calculator
- MAV Design & Build: ADU Estimate & Contract Review Checklist
All facts above were checked against MAV’s own already-published guides on October 25, 2026. The two Houston Permitting Center permit-day figures are reused from MAV’s own already-sourced sibling guides, which captured those pages via the Wayback Machine on September 24, 2026 (the live pages return HTTP 403 to automated fetches). This guide intentionally does not restate a rental-income figure, a per-type cost table, or a specific regulation number that already has a dedicated, better-sourced MAV page — see the links above instead.